Three Rivers Business Centre Felixstowe Road Foxhall Suffolk
Discharge of Condition No. 9 of DC/22/3591/FUL - Erection of 3 no. office units with a Class E (g)(i) use class. that development achieves a high-quality design, which is responsive and sympathetic to its surroundings. The existing units on site adopt a traditional agricultural barn vernacular utilising red brick and weatherboarded elevations with pantile roof. The proposed units would be of a similar form, scale and appearance of the existing units, specifically the units to the south of the site, but the proposed units would incorporate rooflights to enable floor space to be accommodated within the roof. The proposed units would utilise an area vacant maintained land, adjoining the existing business units. The of site is of a significant size to accommodate the proposed building and associated parking without it appearing cramped or contrived. By way of location and form, the proposed development would not detrimentally affect the wider landscape - Precise details of a tree and/or hedge planting scheme
Kelsyth Red Lane Sternfield Suffolk IP17 1HS
Discharge of Condition Nos. 3, 4, 5, 6, 7, 8, 9, 10, 12, 13, 14 and 15 of DC/16/3076/OUT - Erection of single storey dwelling and garage including all ancillary works on surplus amenity land serving Kelsyth, Red Lane, Sternfield - Condition 3) Construction Management Scheme - Attached 'CMP Sternfield' Condition 4, 5, 6, 7 & 9) - These conditions we agree. The surface water management will be by Soak away to the rear and front of the site attachment 'Soakaways' fitted in accordance with Building control regulations, with Aco drains running parallel to the curbed driveway entrance connected to the soakaways preventing the discharge of surface water onto the highways. The drive way material will be Block paved to not impact the road from any debris spilling onto it ie shingle Attachment 'Driveway' the verges will be laid to lawn. Condition 8) - The bin stores are highlighted on the 'Attachment 2 Bins' Condition 10) - Agreed - Sufficient parking will be provided for off street parking for 2 cars. Condition 11) - Visual splays will be provided for accessing the development at road level. Condition 12, 13, 14 & 15) - Ground Contamination Report - We will now instruct a full survey and forward on once completed. Additional information requested Retaining wall - We have appointed 'Team Elite' to supply and fit Steel King posts black 3.6M long with 75mm thick / 230mm high individual sleepers 'Attachment Retaining Wall' Exterior materials - The roof will be grey effect concrete tiles Attached 'Grey Roof tile' the bricks will be red antique brick in keeping with surrounding properties 'Attachment 5 Brick'