LAND AT SCAUR LANE LAZONBY PENRITH
Discharge of condiiton 5 (surface water drainage scheme), 6 (surface water management plan) and 7 (construction method statement), attached to approval 17/0016.
VOREDA HOUSE PORTLAND PLACE PENRITH CUMBRIA CA11 7BF
Discharge of condition 3 (construction traffic management plan), attached to approval 21/0970.
LAND AT GARRIGILL MINE SITE GARRIGILL ALSTON CUMBRIA
Discharge of conditions 3 (construction environmental management plan), 4 (sample materials) and 5 (geocair matting details), attached to approval 21/0400.
LAND WEST OF GILLIANS WELL CALTHWAITE PENRITH
Discharge of condition 3 (construction traffic management plan), attached to approval 20/0548.
HUNTER HALL FARM GREAT SALKELD PENRITH CA11 9NA
Discharge of conditions 8 (archaeology), 9 (construction vehicle parking) and 10 (foul and surface water drainage), attached to approval 21/0214.
LAND SOUTH WEST OF BANK TOP LAZONBY PENRITH
Discharge of conditions 3 (surface water drainage scheme) and 4 (construction management plan), attached to approval 21/0583.
LAND BETWEEN MELROSE COTTAGE AND GRETA COTTAGE LAND BETWEEN GAYTHORN AND WEST VIEW CLIBURN PENRITH
Discharge of conditions 4 (archaeology), 5 (construction phase traffic management plan), 6 (surface water discharge), 7 (highways drainage), 8 (boundary wall to front), 9 (plot 1 section), 10 (sample materials), 11 (surface water drainage scheme), attached to approval 20/0944.
LAND AT CARLETON PENRITH
Discharge of conditions 5 (carriageways, footways, cyclepaths etc), 6 (driveways, footpaths, parking, green spaces specifications), 8 (phase plans), 9 (foul and surface water drainage), 10 (surface water drainage scheme), 11 (construction method statement), 12 (suspended solids), 13 (construction management plan), 14 (archaeology) and 17 (SUDS system maintenance), attached to approval 13/0033.
NORTH LOANING HOUSE ALSTON CA9 3JZ
Discharge of condition 3 (construction management plan), attached to approval 21/0615.
LAND AT EDEN VIEW LANGWATHBY PENRITH CA10 2NH
Discharge of conditions 5 (construction management plan), 10 (construction site plan), 11 (Foul and surface drainage), 12 (tree protection) and 13 (construction traffic movement plan), attached to approval 18/0775.