Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London
Details pursuant to Ref: 19/02718/RE3 for siting/design of refuse facilities per plot (61) in respect of the development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis)
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18
Details pursuant to Ref:19/02718/RE3 for Schedule of tenure/mix per phase (36) in respect of the development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis)
Meridian Water Willoughby Lane And Meridian Way London N18
Full planning application for development of Phase 1b of Meridian Water to provide new residential accommodation (Use Class C3), ground floor commercial floorspace (Use Class E(a, b, c, g)), leisure floorspace (Use Class E(d)) and medical centre (Use Class E(e)) across three buildings including ancillary areas to these uses, roads and footpaths, car and cycle parking provision, public open space including areas for play, landscaping and drainage; and areas of landscaping and open space for temporary and meanwhile uses; Submission of an Environmental Statement.
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details pursuant to ref 19/02718/RE3 PARTIAL DISCHARGE (Plot Z02-01 Phase one) for Impact studies of existing foul, surface and water supply infrastructure (Part A of 64) in respect of the development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
PARTIAL DISCHARGE Details pursuant to Ref: 19/02718/RE3 for Long term monitoring/maintenance plan (18) in respect of the Development of Phase 2 Plot Z02-01 only of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details pursuant to ref 19/02718/RE3 for Construction Management Plan (CMP) (12,13 and 56) in respect of the development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London
Details pursuant to ref: 19/02718/RE3: PARTIAL DISCHARGE for Plot Z02-01 only - Telecommunication/Satellite Strategy (30) for Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details pursuant to ref: 19/02718/RE3: Long Term Monitoring/Maintenance Plan (18) for Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road)
PARTIAL DISCHARGE PLOT Z02-01 Details pursuant to ref: 19/02718/RE3: Feasibility - Navigation For Transport (79) for plot Z02-01 Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Land To The West Of The A10 And North Of Cheshunt Park Brookfield Cheshunt EN7 6PX
Outline application (all matters reserved except access) for a new mixed use Garden Village development comprising up to 1,250 new dwellings (Use Class C3) including affordable housing elderly persons accommodation (Use Class C2/C3) mixed use neighbourhood centre (Use Class E/C3) associated open space and community/recreational facilities new primary school (up to 3FE) and early years nursery new blue light hub site for relocation of Halfhide Lane gypsy community (up to 20 pitches) with ancillary paddock; relocation of Local Authority recycling centre, depot and Halfhide Lane allotments employment land (Use Class B2/B8) primary 33/11 kV sub-station; associated drainage, landscaping and infrastructure together with highway infrastructure and alterations comprising: the creation of a new link road to provide access off the Turnford Interchange; Garden Village loop road section of spine road between northern and southern ends of loop road; creation of new cycle and pedestrian links via upgraded culvert for the A10 underpass to Winnipeg Way and via new bridge crossing over New River to Halfhide Lane associated sustainable transport improvements to Halfhide Lane internal estate roads and associated cycle and pedestrian facilities 07/22/1079/O-PPA Land to the west of the A10 and north of Cheshunt Park Brookfield Cheshunt EN7 6PX.