Ladderswood Estate, Bounded By, Station Road, Palmers Road And Upper Park Road, London, N11
Details pursuant to ref: 16/02673/FUL: retained trees (39), Arboricultural Protection measures (43), Considerate Constructors Scheme (57), Site Waste Management Plan (58), contamination (59), Construction Management and Logistics Plan (64), for the minor material amendment to P12-02202PLA to allow render frames to south elevation extended down to 1st floor, zinc box to south-east corner at ground floor omitted and replaced with brick cladding, stair core cladding adjacent to block V south elevation simplified , zinc cladding aligned flush with full height windows, render frames with brick infill introduced to north elevation to match south elevation, ground floor brick retaining wall and planter omitted due to requirement for turning and unloading/loading area in front of hotel to elevations.
Ladderswood Estate, Bounded By, Station Road, Palmers Road And Upper Park Road, London, N11
Non-Material Minor Amendment (S96a) application pursuant to 16/02673/FUL to amend the trigger point of Condition 3 (Materials), Condition 4 (Levels), Condition 5 (Enclosure), Condition 6 (Parking and Turning Facilities), Condition 7 (Loading/Unloading), Condition 8 (Construction Access Roads), Condition 10 (Refuse Storage Facilities), Condition 17 (External Lighting), Condition 19 (Recycling Infrastructure), Condition 20 (Covered Cycle Parking), Condition 21 (Details of Balconies), Condition 23 (Delivery and Servicing), Condition 24 (Electric Vehicle Charging), Condition 25 (Accessible Parking), Condition 28 (Homezones), Condition 29 (Temporary Vehicular Access), Condition 30 (Communal Telecommunications Equipment), Condition 31 (CCTV Network), Condition 33 (Means to ensure Inclusive Access), Condition 34 (Site Wide Landscaping Strategy), Condition 44 (Tree Protection), Condition 46 (Rainwater Recycling System), Condition 47 (Surface Water Drainage Strategy), Condition 48 (Bat/Bird Nesting Boxes/Bricks), Condition 49 (Green/Brown Roofs), Condition 51 (Renewable Energy), Condition 53 (Combined Heat and Power Facility), Condition 54 (CHSH), Condition 55 (BREEAM), Condition 56 (Green Procurement Plan), and Condition 60 (Contamination Remediation Strategy), to enable site preparation works and demolition works to take place prior to discharge.