Meridian Water Kimberley Way London N18
Erection of one residential unit (Use Class C3) arranged across one building at Meridian Water Phase 1. Detailed Description Provision of 1 additional 3 bed 6 person unit within the Phase 1a boundary as approved by planning permission ref: 20/03821/RM (Details of Reserved Matters (scale, layout, external appearance and landscaping) for 300 units in respect Plots E and A (Phase 1a) arranged across buildings from 3 to 12 storeys in height pursuant to condition 5 of planning permission 16/01197/RE3 dated 10 July 2017 for development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). Application includes details pursuant to condition 29 (green procurement plan), condition 63 (biodiverse roof details), condition 65 (Energy statement), condition 86 (wind assessment), condition 71 (cycle parking details) and 73 (car parking details); of the above permission dated 24/05/2021.
The Royal Chace Hotel The Ridgeway Enfield EN2 8AR
Details submitted pursuant to reference 21/01816/FUL: sound insulation boundary fencing (45) in respect of redevelopment of site involving demolition of existing hotel and erection of a three-storey care-home (C2 use) with 92 rooms and 64 residential dwellings.
10 Yews Avenue Enfield EN1 4QA
Subdivision of rear garden to enable temporary change of use from residential amenity space (Use C3) to community space (Use D2) during the construction of the new community centre at St John Methodist Church (approved under ref: 20/00354/FUL) involving erection of boundary fencing and creation of access via the church grounds.
Public House 413 Green Lanes London N13 4JD
Details pursuant to ref: 17/03634/FUL for boundary treatment (western and part of southern) (condition 4), for the redevelopment of site involving partial demolition of existing buildings to provide refurbished public house (A4) and commercial unit (A1-A5, D2) on the ground floor together with erection of 54 residential units comprising (31 x 1 bed, 22 x 2 bed and 1 x studio) and Part 3, Part 4 and Part 5 storey side and rear extensions with associated car parking, cycle parking, plant, hard/soft landscaping and amenity space at first floor (as amended by revised plans received).