Edmonton EcoPark Advent Way N18 3AG
Eastern Access: Application to Discharge Requirements 4 (Detailed Design Approval), 10 (Provision of Landscaping), 12 (Access and Roads), 13 (Operational Surface and Foul Water Discharge), and 14 (Contaminated Land and Groundwater) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017.
Edmonton EcoPark Advent Way N18 3AG
Site Wide Utilities DCO Schedule 1, paragraphs 2 (4) and (6), Application to Discharge Requirements 4 (Detailed design approval); 10 (Provision of landscaping); 12 (Access and roads); 13 (Operational surface and foul water drainage), and 14 (Contaminated Land and Groundwater) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017. | Edmonton EcoPark Advent Way N18 3AG