Edmonton EcoPark Advent Way N18 3AG
Details submitted for the EcoPark House (Stage 1b, DCO works no. 2 (3), 2 (4) (a), (d), (e), (f), (h), (m) and 2 (6) (a), (d)) to Discharge Planning Requirements 4 (1)(b) (Detailed Design (Piling Risk Assessment and Piling Method Statement)) in relation to the North London Heat and Power Generating Station Order 2017 made on 24th February 2017.
Edmonton EcoPark Advent Way N18 3AG
Detail pursuant to SI 2017 No.215 and Decision Notice 19/02483/DCO (Condition 2) for EcoPark House (Stage 1b, DCO works no. 3, 4 (h), 6 (a) and d) to Further Discharge Requirement 13 (Operational Surface and Foul Water)-Surface Water Drainage Strategy.