Palace Gardens Square Enfield EN2
Public realm landscaping improvements at Palace Gardens Square, involving ground levelling, pavement resurfacing, step arrangements, removal of existing telephone boxes, brick planters, cone benches, lighting columns with erection of raised planters with seating, lighting columns and planting of trees.
Alma Estate EN3
Details pursuant to ref: 19/03834/RM: SUDs Strategy (2) for Details pursuant to condition 5 of outline planning permission ref: 15/2039/OUT and as amended by 17/04670/VAR, and proposed variation by 19/03624/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A and 4 of Alma Estate for the construction of 3 apartment buildings and 13 houses varying between 3 and 7 storeys in height, comprising 303 residential units in total, Class A1 retail units uses and provision of public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with conditions for tree protection (9), ecology and biodiversity strategy (31), drainage strategy (35), green roofs (36), living walls (37), energy strategy (38), green procurement plan (43), SWMP (44), parking (52), loading/unloading (54), delivery and servicing (57), car park management (58), traffic calming (59), cycle parking (60).
Winchmore School Laburnum Grove London N21 3HS
Details pursuant to ref: 20/01169/RE4: Access (4), Landscaping (8), Levels (10), Cycle Parking Facilities (31), Tree Protections (32) for Construction of a new stand alone two storey sixth form block with associated external landscaping works and formation of a new MUGA.
Alma Estate EN3
Details pursuant to ref 17/04748/RM for Phase 2Aii a Management Strategy for the courtyard (5) in respect of the details pursuant to condition 5 of outline planning permission ref: 15/02039/OUT and as amended by 17/04670/VAR in respect of layout, scale, appearance, access, landscaping in relation to Phases 2A, 2Ai and 2Aii of Alma Estate (Merlin House, Cormorant House, Silver Birch Court, Welcome Point and Ponders End Youth Centre) for the construction of five buildings varying between 2 and 8 storeys in height, comprising 340 residential units, Class A1/A2/B1/D1/D2 uses including provision of community centre, youth centre , medical centre, retail units, community offices and provision of energy centre, public open space, private and semi-private amenity space, refuse/recycling and bicycle storage, on and off street car parking together with discharge of conditions in respect of Phases 2A, 2Ai and 2Aii only for tree protection (9), acoustic assessment (27- part discharge), ecology and biodiversity strategy (31) green roofs (36), living walls (37), green procurement plan (43), SWMP (44), air quality (45), parking (52- part discharge in respect of Phase 2Ai and 2Aii only), loading/unloading (54), traffic calming (59), cycle parking (60) pursuant to outline permission ref:15/02039/OUT and as amended by 17/04670/VAR.
79 Chase Side Enfield EN2 6NL
Details submitted pursuant to planning application ref: 15/01447/HOU comprising samples of internal and external materials and finishes (3), details of new vents or flues (5), new and relocated services (6) and details of trees and shrubs (11) in respect of erection of a single storey rear extensions, first floor infill extension, internal and external alterations to include refurbishment, new boundary wall, gates and railings, additional hardstanding with associated landscaping to front and terrace to rear.
14 Langside Crescent London N14 7DR
Details pursuant to ref: 22/00727/HOU: external finishing materials (3), Tree Protection Plan (7), landscaping (8), for the two storey side extension, single storey rear extension, rear dormer with front rooflights and a outbuilding to rear.
79 Windmill Hill Enfield EN2 7AF
Details pursuant to ref: 19/01044/FUL (allowed on appeal APP/Q5300/W/20/3263151),: Arboricultural Method Statement and Tree Protection (7), for the redevelopment of site involving demolition of existing buildings and erection of 49 Self-contained flats within 3 Blocks (part 3, part 4 storey's) comprising 12 x 1, 19 x 2 and 18 x 3 bed involving shared basement level between Block B and C ,installation of lifts, solar panels and balconies together with erection of a substation, play area and associated access and landscaping.
Ladderswood Estate, Bounded By, Station Road, Palmers Road And Upper Park Road, London, N11
Non-Material Minor Amendment (S96a) application pursuant to 16/02673/FUL to amend the trigger point of Condition 3 (Materials), Condition 4 (Levels), Condition 5 (Enclosure), Condition 6 (Parking and Turning Facilities), Condition 7 (Loading/Unloading), Condition 8 (Construction Access Roads), Condition 10 (Refuse Storage Facilities), Condition 17 (External Lighting), Condition 19 (Recycling Infrastructure), Condition 20 (Covered Cycle Parking), Condition 21 (Details of Balconies), Condition 23 (Delivery and Servicing), Condition 24 (Electric Vehicle Charging), Condition 25 (Accessible Parking), Condition 28 (Homezones), Condition 29 (Temporary Vehicular Access), Condition 30 (Communal Telecommunications Equipment), Condition 31 (CCTV Network), Condition 33 (Means to ensure Inclusive Access), Condition 34 (Site Wide Landscaping Strategy), Condition 44 (Tree Protection), Condition 46 (Rainwater Recycling System), Condition 47 (Surface Water Drainage Strategy), Condition 48 (Bat/Bird Nesting Boxes/Bricks), Condition 49 (Green/Brown Roofs), Condition 51 (Renewable Energy), Condition 53 (Combined Heat and Power Facility), Condition 54 (CHSH), Condition 55 (BREEAM), Condition 56 (Green Procurement Plan), and Condition 60 (Contamination Remediation Strategy), to enable site preparation works and demolition works to take place prior to discharge.
Alma Estate EN3
Details pursuant to ref: 19/03624/VAR: Phase 2A and Phase 4 Tree Protection (9), Insulation (27), Archaeology (30), Site Waste Management Plan (44), cycle parking (60) and Phase 2A, Air Quality (45), for the submission of planning application under Section 73 to amend conditions 2 (approved drawings), 3 (phasing plan), 7 (residential units), 8 (non-residential floorspace) and 52 (car parking provision) of outline planning permission 15/02039/OUT, as amended by 17/04670/VAR, to facilitate minor changes to residential unit numbers from 993 to 1,080, building heights, development zones, non residential floorspace, landscaping and play provision and parking provision in relation to Phases 2A and 4 of the Alma Estate, Enfield,EN3. Submission of Environmental Statement Addendum.
18 Barber Close London N21 1BE
Details pursuant to ref: 19/03189/FUL: ground levels (3) SuDs (4), potable water (6), energy statement (7), Construction Management Plan (9), Tree Protection Plan and Method Statement (12), landscaping (13), enclosure (15), potable water (18), for the sub-division of site and conversion of property into 1 x 3 bed and 1 x 2 bed single family dwellings involving part single storey side extension and a 2-storey rear extension with associated parking and amenity.