Site:-Grass Verge Opposite To 81 Enfield Road And Cotswold Way Enfield EN2 7ET
Installation of a 17m high telecommunications monopole with equipment cabinets at base and associated works.
Site:-Telecommunications Mast On Grass Verge On The Glade, Adjacent To Garages N21
Installation of a telecommunications monopole to a maximum height of 20m (including antennas and dishes) with equipment cabinets at base.
Site:- Opposite Open Land, Adjacent To Maltby Drive And Electricity Sub Station Hoe Lane EN1
Installation of a telecommunications monopole to a maximum height of 15m with equipment cabinets at base.
Site:- Public Footpath Adjacent To Land Corner Of The Fariway And Avenue Road London N14
Installation of 15m Telecommunications phase 8 Monopole with cabinet at base and associated ancillary works.
Site:- Opposite Crew Hill Station Cattlegate Road Enfield EN2 9DN
Installation of a 20m telecommunications monopole, 2 x antenna, 3 cabinets, and associated works.
Site Public Footpath Ordanace Road Adjacent To Bartholomew House Enfield EN3
Installation of a 18m telecommunications monopole with equipment cabinets and associated ancillary works.
Public Footpath, Fore Street Outside Rear Of 42 And 43 Folkestone Road London N18
Installation of 17m telecommunications monopole antennas, ground based apparatus and ancillary development.
Ladderswood Estate, Bounded By, Station Road, Palmers Road And Upper Park Road, London, N11
Non-Material Minor Amendment (S96a) application pursuant to 16/02673/FUL to amend the trigger point of Condition 3 (Materials), Condition 4 (Levels), Condition 5 (Enclosure), Condition 6 (Parking and Turning Facilities), Condition 7 (Loading/Unloading), Condition 8 (Construction Access Roads), Condition 10 (Refuse Storage Facilities), Condition 17 (External Lighting), Condition 19 (Recycling Infrastructure), Condition 20 (Covered Cycle Parking), Condition 21 (Details of Balconies), Condition 23 (Delivery and Servicing), Condition 24 (Electric Vehicle Charging), Condition 25 (Accessible Parking), Condition 28 (Homezones), Condition 29 (Temporary Vehicular Access), Condition 30 (Communal Telecommunications Equipment), Condition 31 (CCTV Network), Condition 33 (Means to ensure Inclusive Access), Condition 34 (Site Wide Landscaping Strategy), Condition 44 (Tree Protection), Condition 46 (Rainwater Recycling System), Condition 47 (Surface Water Drainage Strategy), Condition 48 (Bat/Bird Nesting Boxes/Bricks), Condition 49 (Green/Brown Roofs), Condition 51 (Renewable Energy), Condition 53 (Combined Heat and Power Facility), Condition 54 (CHSH), Condition 55 (BREEAM), Condition 56 (Green Procurement Plan), and Condition 60 (Contamination Remediation Strategy), to enable site preparation works and demolition works to take place prior to discharge.
Site:-Adjacent To Public Open Space Central Avenue And Opposite The Approach Enfield EN1 3QD
Installation of a 5G Telecommunications 20m monopole with equipment cabinets at base.
Site:-Public Footpath Wilbury Way London N18
Installation of a 5G Telecommunications 15m monopole with equipment cabinets at base.