90-92, 98 And 104 Lockfield Avenue Enfield EN3 7PX
Variation of conditions 1 (approved plans), 5 (living wall), 7 (cycle provision), 10 (travel plan) and 12 (external finishes) of approval granted under reference 18/02174/VAR to include new external plant compounds, raised plant platform, installation of liquid nitrogen gas tank, installation of 1,845sqm mezzanine floorspace at units 1, 100 and 102 for ancillary office, plant and laboratory space, additional parking, alterations to elevations, northern access and landscaping to allow operation of medical manufacturing facility (B1(c)) at units 1, 104, 102 and 100.
Brent Cross Cricklewood Regeneration Area, London, NW2
Section 73 planning application to develop land without complying with the conditions attached to planning ref C/17559/08 granted on 28 October 2010 (the 2010 permission) for development as described below: Comprehensive mixed use redevelopment of the Brent Cross Cricklewood Regeneration Area comprising residential uses (Use Class C2, C3 and student/special needs/sheltered housing), a full range of town centre uses including Use Classes A1 - A5, offices, industrial and other business uses within Use Classes B1 - B8, leisure uses, rail based freight facilities, waste handling facility and treatment technology, petrol filling station, hotel and conference facilities, community, health and education facilities, private hospital, open space and public realm, landscaping and recreation facilities, new rail and bus stations, vehicular and pedestrian bridges, underground and multi-storey parking, works to the River Brent and Clitterhouse Stream and associated infrastructure, demolition and alterations of existing building structures, CHP/CCHP, relocated electricity substation, free standing or building mounted wind turbines, alterations to existing railway including Cricklewood railway track and station and Brent Cross London Underground station, creation of new strategic accesses and internal road layout, at grade or underground conveyor from waste handling facility to CHP/CCHP, infrastructure and associated facilities together with any required temporary works or structures and associated utilities/services required by the Development (Outline Application). The application is accompanied by an Environmental Statement.