Cemetery House Church Street London N9 9HP
Details pursuant to ref: 18/04864/FUL: Construction Management Plan (3), surfacing materials (5), boundary treatments (6), external materials (7), cycle parking (8), waste management facilities (9), landscaping (10), Bat Survey (11), biodiversity enhancements (17), for the demolition of the former Coach house and erection of terrace of 4 x 2 bed single family dwellings with amenity space together with part demolition and renovation of Cemetery house to provide Offices at ground and first floor level involving lowering and extension to existing basement, single storey rear extension with internal terraces, rear dormers with rooflights, replacement windows and alterations to existing lightwells and creation of an additional lightwell together with the construction of new hardstanding with garages ,car parking spaces, installation of fencing, new site access to south boundary and access gates for pedestrians and vehicles.
Marie Elana Westpole Avenue Barnet EN4 0BD
Details submitted pursuant to Ref:17/01951/FUL comprising levels (03), landscaping (05), surfacing materials (07), construction methodology (08), access (09), considerate constructors scheme (10), biodiversity enhancements (11), external materials (13), cycle spaces (14) and boundary treatment (16) in respect of demolition of existing detached house and erection of 3 x 3-bed terraced single family dwellings, with a basement level and associated parking.
22 Worlds End Lane London N21 1PP
Details submitted pursuant to reference 19/01588/FUL: construction management plan (3), SuDS (4), bat survey (8), landscaping (9), boundary treatments (10), cycle parking (12), car parking layout (13), potable water (14), tree protection (15) and energy statement (16) in respect of demolition of existing dwellinghouse and erection of a 2-storey, 4-bedroom dwellinghouse involving accommodation in roofspace and associated parking and landscaping.
25 Bullsmoor Way Waltham Cross EN8 8HN
Details pursuant tor ref: 18/02382/FUL: cycle parking (6), refuse (7), landscaping (8), surface drainage (9), Construction Logistics Plan (10), National Standard for Housing Design (11), boundary (12), for the subdivision of site and erection of end of terrace 2 bed single family dwelling.