Fern House School Keswick Drive Enfield EN3 6NY
Details pursuant to ref: 19/01183/RE4: External finishing materials (3), Surfacing materials (4), Construction Management plan (6), Retained trees hard and soft landscaping (7), Construction Traffic Management Plan (12), Construction Waste management Plan (14), Ecology bird bat boxes (22 - Part 1 (details of the siting and number of bat bricks/tiles and bird bricks/tubes/boxes)), Sustainable drainage strategy details (27) for Demolition of existing school building, modular classroom buildings and caretakers house and replacement with a part 2-storey, part single storey school building, an enclosed all-weather MUGA with external lighting, hard play areas, revised and additional car parking and associated external works (revised plans).
29 The Chine London N21 2EA
Details submitted pursuant to reference 18/03550/FUL: external finishing materials (3), cycle storage (5), refuse and recycling storage (6), construction management plan (7), landscaping plan (9), tree protection and arboricultural method statement (10), energy statement (11), potable water (12) and SuDS (13) in respect of subdivision of site involving demolition of existing garage and erection of single storey Chalet style 2-bed family dwellinghouse with habitable space in the roof with associated dormers, accessed via Nestor Avenue.
90 Camlet Way Barnet EN4 0NX
Details submitted pursuant to reference APP/Q5300/W/20/3248889: tree protection (9) and construction management plan (11) in respect of redevelopment of site involving demolition of existing building and erection of 9 self contained flats comprising (8 x 2 bed and 1 x 3 bed) within a two storey building including accommodation in roof space together with erection of front boundary wall, gates and railings, new vehicular access, associated parking and landscaping.
22 Worlds End Lane London N21 1PP
Details submitted pursuant to reference 19/01588/FUL: construction management plan (3), SuDS (4), bat survey (8), landscaping (9), boundary treatments (10), cycle parking (12), car parking layout (13), potable water (14), tree protection (15) and energy statement (16) in respect of demolition of existing dwellinghouse and erection of a 2-storey, 4-bedroom dwellinghouse involving accommodation in roofspace and associated parking and landscaping.
Albany Park Hertford Road Enfield EN3 5PA
Details submitted pursuant to reference 19/02738/RE4 comprising construction and demolition works details (02), enclosure details (04), means of access (06), surfacing materials (07), construction waste management plan (09), construction management plan (11), landscaping plan (12), tree protection plan (14), arboricultural impact assessment (15), contamination assessment (18) in respect of Albany Park Turkey Brook restoration and flood alleviation scheme involving construction of new watercourse, flood storage area and combined footpath-cycleway involving excavation works to create river channel and wetland basins, retention of resultant spoil on site to create bund to the south and landscaping of surrounding areas (4.1ha).