Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road)
PARTIAL DISCHARGE PLOT Z02-01 Details pursuant to ref: 19/02718/RE3: Feasibility - Navigation For Transport (79) for plot Z02-01 Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
103 & Commercial Premises At Rear Of, Chase Side, Enfield, EN2 6NL
Details submitted pursuant to ref:P13-02570PLA comprising landscaping (12), SuDS (18) and energy statement (20) in respect of redevelopment of site to provide 5 additional dwellings involving demolition of north barn and erection of a part single, part 2-storey block to provide 2 x 2-bed single family dwellings, conversion of south barn involving a part single, part 2-storey side extension to provide 3 residential units comprising 2 x 2-bed and 1 x 3-bed single family dwellings, demolition of conservatory to existing farm house and shop, off street parking and associated landscaping.
Land At Estate Way, And Gateway Business Centre, Church Road, E10
A comprehensive phased development comprising the demolition of all existing buildings and structures and the erection of building blocks to provide a mixed use scheme that would accommodate 496 residential units (Use Class C3), 15,029 sqm of mixed use Class E (g - office/light industrial processes) and B8 (storage and distribution) together with 166 sqm of Class E (a, b, and c) for retail floor space. The development would comprise thirteen buildings that would range between two and twelve storeys around new public realm with pedestrian, car and cycle routes with landscaping, play space, car and cycle parking and servicing arrangements.
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: renewable energy (66) In respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: CCTV (87) in respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Meridian Water Willoughby Lane And Meridian Way London N18
Details pursuant to ref: 20/03821/RM: Sculptural elements in park (6) for Details of Reserved Matters (scale, layout, external appearance and landscaping) for 300 units in respect Plots E and A (Phase 1a) arranged across buildings from 3 to 12 storeys in height pursuant to condition 5 of planning permission 16/01197/RE3 dated 10 July 2017 for development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). Application includes details pursuant to condition 29 (green procurement plan), condition 63 (biodiverse roof details), condition 65 (Energy statement), condition 86 (wind assessment), condition 71 (cycle parking details) and 73 (car parking details) of the above permission.
1-5, Coleman Parade, And New River House, 6A, Coleman Parade, 6-14, Southbury Road, Enfield, EN1
Details of ground floor layout, phasing of construction, hard and soft landscaping, external finishing materials, shopfronts to Coleman Parade and archaeological work programme submitted pursuant to conditions 02, 03, 09, 10, 11 & 17 of approval under appeal ref: APPQ5300/A/07/2041815/NWF (TP/06/1430) for construction of 191 residential units involving conversion and extension of New River House (block A) by the erection of a side extension to east elevation at 4th storey level and above, together with construction of three additional floors to total 13 stories providing 94 units (41 x 1-bed, 44 x 2-bed, 1 x 1-bed duplex, 8 x 2-bed duplex) with car parking at 1st floor level; demolition of first floor of No. 1-5 Coleman Parade (block B) and erection of 5 additional floors to total 6 stories providing 20 x 2-bed units together with installation of new shop fronts to ground floor commercial units and glazed link to New River House from 1st floor level and above; erection of a 9-storey block to the rear (block C) comprising 77 units (42 x 1-bed, 35 x 2-bed) with car parking on ground and 1st floor levels with 1st floor vehicular access to New River House; construction of sub-station to rear and provision of associated cycle parking.
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details pursuant to ref: 19/02718/RE3: bat/badger checks pre commencement (44), eradication strategy for invasive species (46) in relation to Phase 1/Plot Z02_01, for the development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: electric parking (72) in respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details pursuant to ref: 19/02718/RE3 : Remediation Strategy (16), piling (22), in relation to Phase 1/Plot Z02.01 only, for the development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).