Alma Estate EN3
Details pursuant to ref: 19/03624/VAR: Energy Performance (39), Phase 2A for the submission of planning application under Section 73 to amend conditions 2 (approved drawings), 3 (phasing plan), 7 (residential units), 8 (non-residential floorspace) and 52 (car parking provision) of outline planning permission 15/02039/OUT, as amended by 17/04670/VAR, to facilitate minor changes to residential unit numbers from 993 to 1,080, building heights, development zones, non residential floorspace, landscaping and play provision and parking provision in relation to Phases 2A and 4 of the Alma Estate, Enfield,EN3. Submission of Environmental Statement Addendum.
Alma Estate EN3
Details pursuant to ref: 19/03624/VAR: energy performance (39) Phase 4, for the submission of planning application under Section 73 to amend conditions 2 (approved drawings), 3 (phasing plan), 7 (residential units), 8 (non-residential floorspace) and 52 (car parking provision) of outline planning permission 15/02039/OUT, as amended by 17/04670/VAR, to facilitate minor changes to residential unit numbers from 993 to 1,080, building heights, development zones, non residential floorspace, landscaping and play provision and parking provision in relation to Phases 2A and 4 of the Alma Estate, Enfield,EN3. Submission of Environmental Statement Addendum.
59-61 Church Street Enfield EN2 6AN
Details pursuant to ref: 22/02865/FUL: refuse storage facilities (7), cycle parking (8), for the proposed residential development consisting of first rear extensions and mansard roof extension to create 6 self contained residential units at no.s 59 & 61 Church Street, Enfield EN2 6AN
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London
Details pursuant to ref: 19/02718/RE3: PARTIAL DISCHARGE for Plot Z02-01 only - Telecommunication/Satellite Strategy (30) for Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details pursuant to ref: 19/02718/RE3: Long Term Monitoring/Maintenance Plan (18) for Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road)
PARTIAL DISCHARGE PLOT Z02-01 Details pursuant to ref: 19/02718/RE3: Feasibility - Navigation For Transport (79) for plot Z02-01 Development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Land At Estate Way, And Gateway Business Centre, Church Road, E10
A comprehensive phased development comprising the demolition of all existing buildings and structures and the erection of building blocks to provide a mixed use scheme that would accommodate 496 residential units (Use Class C3), 15,029 sqm of mixed use Class E (g - office/light industrial processes) and B8 (storage and distribution) together with 166 sqm of Class E (a, b, and c) for retail floor space. The development would comprise thirteen buildings that would range between two and twelve storeys around new public realm with pedestrian, car and cycle routes with landscaping, play space, car and cycle parking and servicing arrangements.
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: renewable energy (66) In respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Meridian Water Willoughby Lane And Meridian Way London N18
Details submitted pursuant to reference 16/01197/RE3: CCTV (87) in respect of development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). OUTLINE APPLICATION - ACCESS ONLY. An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2011 (as amended by the 2015 Regulations).
Meridian Water Willoughby Lane And Meridian Way London N18
Details pursuant to ref: 20/03821/RM: Sculptural elements in park (6) for Details of Reserved Matters (scale, layout, external appearance and landscaping) for 300 units in respect Plots E and A (Phase 1a) arranged across buildings from 3 to 12 storeys in height pursuant to condition 5 of planning permission 16/01197/RE3 dated 10 July 2017 for development of Phase 1 of Meridian Water comprising up to 725 residential units, new station building, platforms and associated interchange and drop-off facilities including a pedestrian link across the railway, a maximum of 950 sqm retail (A1/A2/A3), floorspace, a maximum of 600 sqm of community (D1) floorspace, a maximum of 750 sqm of leisure (D2) floorspace, associated site infrastructure works including ground and remediation works, roads, cycle-ways and footpaths, utility works above and below ground, surface water drainage works, energy centre and associated plant, public open space and childrens play areas, and various temporary meantime uses without structures (landscaping and open space). Application includes details pursuant to condition 29 (green procurement plan), condition 63 (biodiverse roof details), condition 65 (Energy statement), condition 86 (wind assessment), condition 71 (cycle parking details) and 73 (car parking details) of the above permission.