Wayside Orchard Way Berry Hill Gloucestershire GL16 7AQ
Conversion and extension to loft and alterations to dwelling to include raising of roof height and alterations to facing materials and fenestration.
19 Lancaster Court Lydney Gloucestershire GL15 5SZ
Loft conversion to provide additional habitable accommodation at first floor level. Construction of dormer window and insertion of roof light.
Springbank The Ruffit Littledean Cinderford Gloucestershire GL14 3LA
Proposed loft conversion with fenestration changes.
The Flat The Haven Hart Lane Ruardean Gloucestershire GL17 9UT
Conversion of first floor flat and ground floor garage to dwellinghouse with associated internal and external alterations including amendments to fenestration. (part-retrospective)
Thistlemoor Church Lane Northwood Green Westbury On Severn Gloucestershire GL14 1ND
Change of use and conversion of existing garage to provide a mixed-use holiday let/annexe with associated façade works and new dormer windows to roof.
The Roosting Place School Road Pillowell Gloucestershire GL15 4QT
Conversion of garage into annexe accommodation. Proposed dormer windows, rooflights and porch to main dwelling.
Whitehill House Back Lane Drybrook Gloucestershire GL17 9BU
Erection of single storey extension to rear of property, addition of dormer windows to existing loft conversion and new gabled roof to existing front porch.
Bandor Mopla Road Tutshill Gloucestershire NP16 7PS
Application under section 192 to establish whether the conversion of attached garage into a studio with associated works requires planning permission. 2. The creation of a new doorway and ground floor window in the rear (opposite to principal) elevation. 3. Removal of an internal loadbearing partition.
Claremont High Street Newnham Gloucestershire GL14 1BE
Loft conversion, installation of dormer windows and additional roof lights.
1 Beech Cottage Forge Hill Lydbrook Gloucestershire GL17 9QS
Conversion of independent block built double garage with a twin pitch roof into a one bedroom holiday let including the Installation a septic and filtration tank with an attenuation tank. Insulation of all walls, floors and ceilings, erection of internal insulated stud walls to form kitchen, bedroom and bathroom areas. Installation of new electrical/mechanical items throughout to include extractor fans where required and Install new upvc doors/windows throughout Install electrical heating system.