Clover Hill Community Primary School Glenhurst Drive Whickham NE16 5SJ
Demolition of existing brick bin store enclosure and relocation to new position, installation of palisade fence and gate to create a new bin store secure enclosure atop earth retaining wall and installation of palisade fence and gate to create new air source heat pump secure enclosure containing 5 no. air source heat pumps
Boyd And Co Tundry Way Blaydon Blaydon On Tyne NE21 5SW
Demolition of factory buildings and offices, reinstatement of existing boundary fencing with new 2.3m high palisade fencing and gates and siting of portacabin (already commenced) (amended plan received 29.04.2021, 05.05.2021, 08.07.2021) (revised description 05.05.2021)
Tyne Bridge House Bottle Bank Gateshead
Proposed split-level office development (A2 and B1a uses) on two levels, with reception and meeting room at a lower level to the main office accommodation and a roof terrace, providing 522 sqm of office space and ancillary accommodation, demolition of existing sub-station, alterations to existing access steps and perimeter parapet walls, with the insertion of new fenestration on the northern and eastern elevations, re-alignment of the refuse store fence, and western wall and windows, and installation of planting strip at Bottle Bank (amended 02/10/20).
202 Kells Lane Gateshead NE9 5JA
Single storey porch extension to front, with new wall adjacent to back footpath. Demolition of existing boundary wall to be replaced with masonry and timber wall/fence