South Bank Building Kingsway South Gateshead NE11 0JS
Change of use of existing offices to medical examination assessment centre with associated internal and external alterations including enclosure of rear car park with 1.8m high timber fence, automated cark park barrier and access control system, ramps and external plant and screen on roof
49 Larne Crescent Sheriff Hill Gateshead NE9 5RP
Replace flat roof with pitched roof to front and side remove upvc full height window and replace with brick work. Remove upvc porch and replace with oak post and roof support structure, alterations to the boundary wall/fence.
Tyne Bridge House Bottle Bank Gateshead
Proposed split-level office development (A2 and B1a uses) on two levels, with reception and meeting room at a lower level to the main office accommodation and a roof terrace, providing 522 sqm of office space and ancillary accommodation, demolition of existing sub-station, alterations to existing access steps and perimeter parapet walls, with the insertion of new fenestration on the northern and eastern elevations, re-alignment of the refuse store fence, and western wall and windows, and installation of planting strip at Bottle Bank (amended 02/10/20).