25 - 27 Exeter Street Gateshead NE8 4EY
Conversion of 2 No flats to 1No house and proposed 2 storey and single storey rear extensions (description amended 20/3/2023)
46 Causeway Carr Hill Gateshead NE9 6QY
Change of use from public house to 9no. self contained flats with addition of two storey side extension, dormer windows to north, east and west elevations and alterations to fenestration (amended plans received 29.09.2021, parking survey received 14.12.2021, bat survey received 28.07.2022, bat roost assessment received 06.09.2022, amended plans and CMRA received 17.11.2022 and 13.01.2023, amended red line plan and ownership certificate received 09.02.2023 and 10.02.2023, amended site plan received 13.03.2023).
Valley View Residential Home Burn Road NE21 6DY
Conversion of former residential care home to 13 flats (use class C3) (Phase 2) (amended 29/05/22, 12/06/22, 29/06/22, 05/09/22 and 09/01/23, and additional information received 21/07/22, 21/12/22 and 13/02/23).
Co-Operative Buildings Hexham Old Road Ryton NE40 3ER
Conversion of former Co-op Building to 6 x 2-bed flats, 2 x 1-bed flats and 1 x 2-bed house (already commenced) (additional/amended information received 24/11/2021, 09/03/2022, 28/06/2022).
The Shakespeare Fife Street Gateshead NE8 3RR
Change of use of public house (sui-generis) to community hub (sui-generis) comprising cafe, kitchen, workshop, meeting spaces at ground floor, and 4no. one bedroom flats at first floor, including minor changes to the existing facades comprising new main entrance and 1no. additional window (amended plan received 29.09.21).
Lawrence Hill Court Thorne Avenue Felling
Conversion of Warden's House to 2no. two bedroom flats
14-17 Talbot Terrace Birtley Birtley DH3 2PQ
Conversion of old guest house into three 1st floor 2 bedroom flats
2 Hills Street Gateshead NE8 2AS
Conversion of estate agents (use class A2) to a seven bed House in Multiple Occupation at ground floor level (Sui Generis) and three studio apartments at first floor level (use class C3) (description amended and revised plans received 02.06.2020).