J And J Stanley Recycling Ltd 1 Cowen Road Blaydon NE21 5TW
Extension to recycling facility (retrospective)
The Runhead Holburn Lane Ryton NE40 3HJ
Extension of current temporary approval (ref. DC/22/00182/FUL) for 1 year for the retetnion of Tipi within the beer garden, 1no. timber clad container and associated decked area.
KFC Clasper Way Newcastle Upon Tyne NE16 3BE
Erection of extension to the rear of building, addition of cladding and new bin store.
Metinvest/Spartan UK Ropery Road Gateshead NE8 2RD
Erection of two extensions to form new staff welfare facilities including changing, locker rooms, shower and toilets.
1 Cowen Road Blaydon NE21 5TW
Variation of condition 4 (number of daily vehicle movements) of planning approval DC/14/00447/FUL for a waste sorting, recycling and scrap metal facility and associated extensions and buildings, to increase the number of daily vehicle movements from 60 (30 in and 30 out) to 300 (150 in and 150 out).
ROWLANDS ACCOUNTANTS Rowland House Portobello Road Birtley DH3 2RY
Proposed part change of use to convert a redundant office storage area to a tyre fitting facility including an extension and provision of entrance canopy to offices (amended site plan received 26.07.2023 and 23.08.2023).
Alexandra Hall 163 Alexandra Road Gateshead NE8 1RB
Single storey rear extension (retrospective)
Crawcrook DIY And Trade 12 Main Street Ryton NE40 4ND
Re-configuration and extension to the existing Crawcrook DIY and Trade building with associated car park re-configuration (resubmission) (amended plans received 31.05.2023, 28.06.2023, 07.07.2023, 25.07.2023)
NEWCASTLE TOOL AND GAUGE LTD Unit 1 Queens Court North Team Valley Gateshead NE11 0BU
Extension of existing ground floor office accommodation and first floor mezzanine storage deck including insertion of new windows to north and east elevations (additional information received) (amended 18/05/23).
46 Causeway Carr Hill Gateshead NE9 6QY
Change of use from public house to 9no. self contained flats with addition of two storey side extension, dormer windows to north, east and west elevations and alterations to fenestration (amended plans received 29.09.2021, parking survey received 14.12.2021, bat survey received 28.07.2022, bat roost assessment received 06.09.2022, amended plans and CMRA received 17.11.2022 and 13.01.2023, amended red line plan and ownership certificate received 09.02.2023 and 10.02.2023, amended site plan received 13.03.2023).