Ryton Community Centre Cross House Ryton Village Ryton NE40 3QP
Replace existing 4 panel double doors with real raised and fielded 4 panel timber double doors: (fanlight over remains) and replace rear door with new to match existing in Cross House and form window in north wall of Community Centre Main Hall. Replacement of existing glazed aluminium doors to east elevation of Community Centre Main Hall (Revised description. Amended plans received on 12/10/2023)
46 Causeway Carr Hill Gateshead NE9 6QY
Change of use from public house to 9no. self contained flats with addition of two storey side extension, dormer windows to north, east and west elevations and alterations to fenestration (amended plans received 29.09.2021, parking survey received 14.12.2021, bat survey received 28.07.2022, bat roost assessment received 06.09.2022, amended plans and CMRA received 17.11.2022 and 13.01.2023, amended red line plan and ownership certificate received 09.02.2023 and 10.02.2023, amended site plan received 13.03.2023).
Fifth Avenue Business Park, Victory House Earlsway Team Valley Gateshead Gateshead NE11 0EL
Replacement of existing sliding doors with rotating door and side entrance door, construction of condenser compound between Victory House and Mayflower House, demolition of existing external plant compound and landscape and replacement of existing aluminium windows.
The Plough Front Street Kibblesworth Birtley NE11 0YJ
Single storey extensions to the rear of the public house/restaurant premises, alterations to existing single storey flat roof area to allow use as roof top terrace, including glazed balustrades, construction of glazed roof terrace bar, external staircase, various works of remodelling and refurbishment including replacement window frames, alterations to entrances and 2.4m high sliding gate to bin store (Amended Plan received 19.05.21).