Land East Of New Barn Road Southfleet Dartford Kent
Proposed construction of a battery energy storage facility and associated works including battery energy storage containers, AUX (Auxiliary) transformer, KNAN transformers, MV (Medium voltage) Switch room, DNO (distribution network operator) switch room, erection of boundary fencing & CCTV camera and connection to existing electricity grid. Formation of temporary construction compound.
Former Northfleet Cement Works The Shore Northfleet Gravesend Kent DA11 9AN
EDC Consultation - Installation of a 33/11kV primary electricity sub station with associated vehicular access and boundary fencing
34 Churchside Vigo Gravesend Kent DA13 0SJ
Application for approval of condition 3 attached to planning permission reference number 20210458 relating to the permeable block paving, dark grey brick border and boundary fence.
Land At Heron Hill Lane Meopham Gravesend Kent
Application for approval of conditions, 3, 4, 5, 6, 9, 10,18, 19 and 20 attached to planning application reference number 20180163 allowed on Appeal under reference number APP/K2230/W/19/3223958 relating to details of condition (3) Details to prevent the discharge of surface water from the site onto the public highway, Condition (4) Repair and resurfacing of the unmade byway, Condition (5) Wildlife Mitigation, Condition (6) Soft Landscaping Scheme, Condition (9) Hard surface treatments and fencing, walling, retaining walls and other boundary treatments, Condition (10) Entrance Gates, Condition (18) External Materials for Utility Building, Condition (19) Refuse disposal and Condition (20) External lighting.
Shell Chalk Service Station 179 Rochester Road Gravesend Kent DA12 4TN
Application for approval of conditions 2, 3 and 4 attached to planning permission reference number 20191158 relating to refuse storage, boundary fence details and external materials.
93 Downs Road Istead Rise Gravesend Kent DA13 9HD
Application for approval of condition 2 (i) (a) and (b) of planning permission reference number 20181099 relating to the details of the fencing/privacy screen/means of boundary enclosure to be erected along the north-western side of the raised platform and railing details along the south-west and south-eastern side of the raised platform, and a timetable of implementation and fencing/privacy screen/means of boundary enclosure.