Former BBC Television Centre Wood Lane London
Details to partially discharge Condition 25 (Sustainable Design and Construction Statement), for Plot H, of planning permission (ref. 2016/04585/VAR) dated 22 August 2017.
Former BBC Television Centre Wood Lane London
Details to partially discharge Condition 39 (Post-Construction Airwaves Study), for Plot H, of planning permission (ref. 2016/04585/VAR) dated 22 August 2017.
Watermeadow Court Watermeadow Lane London
Details to discharge Condition 6 (Construction Management Plan and Construction Logistics Plan) for Phase 2 works, of Planning Permission (ref. 2022/00695/VAR) dated 10 March 2023. Watermeadow Court (Phase 2) - Construction Logistics Plan prepared by NRG Consulting Watermeadow Court (Phase 2) - Construction Management Plan prepared by NRG Consulting NB These documents have been written to address Phase 2 of the development only, which refers to all works done from after the end of the piling phase until handover.
Land At The Former Hartopp Point And Lannoy Point Aintree Estate Pellant Road London SW6 7NG
Details to discharge Condition 4 (Ground and Enabling Works) and Condition 14 (Construction Logistics Plan) of planning permission (ref: 2022/01346/FR3) dated 9 February 2023.
Fulham Town Hall Fulham Road London SW6 1ER
Submission of details of a detailed design and method statement (in consultation with London Underground) for the foundations, basement and ground floor structures, or for any other structures below ground level, including piling (temporary and permanent), which: a) provide details on all structures, c) demonstrate that there will at no time be any potential security risk to the railway, property or structures, d) accommodate the location of the existing London Underground structures and tunnels, e) accommodate ground movement arising from the construction thereof, and f) mitigate the effects of noise and vibration arising from the adjoining operations within the structures, pursuant to the partial discharge of Condition 5 of planning permission reference: 2021/04043/VAR dated 06 July 2023.
Land At The Former Hartopp Point And Lannoy Point Aintree Estate Pellant Road London SW6 7NG
Details to discharge Condition 13 (Construction Management Plan) of planning permission (ref: 2022/01346/FR3) dated 9 February 2023.
Centre House 56 Wood Lane London W12 7SB
Partial discharge of Condition 11 (Infrastructure Protection) relating to superstructure construction of Planning Application (ref: 2018/03058/FUL) dated 23 March 2020.
St Pauls Girls School Brook Green London W6 7BS
Details to partially discharge Condition 8 (External Materials) for Phase 3 (construction of the CDI building only) of Listed Building Permission 2020/01525/LBC dated 13 May 2021.
St Pauls Girls School Brook Green London W6 7BS
Details to partially discharge Condition 16 (External Materials) for Phase 3 (construction of the CDI building only) of Planning Permission 2020/01524/FUL dated 13 May 2021.
9 Beaumont Avenue London W14 9LP
Details to discharge Condition 13 (Artificial lighting); Condition 14 (Car park management plan); Condition 16 (Low emission delivery and servicing plan); Condition 18 (Delivery and servicing plan); Condition 19 (Refuse) and Condition 29 (Construction method statement), of Planning Permission (ref. 2022/01426/FUL) dated 1 November 2022.