Blythe House 23 Blythe Road London W14 0QX
Variation to wording of conditions 9, 17 and 18 of planning permission ref: 2022/02057/VAR granted 5th October 2022 for the 'Variation of wording of condition 10 of planning permission ref: 2018/01405/FUL granted 17th August 2018 for the 'Dismantling, salvage and later reinstatement of gates, gate piers and railings at Gate C; erection of temporary vehicle gates at Gate C in connection with temporary enlargement of crossover to Blythe Road; removal of selected gates and railings at Gate A; demolition of 3no unlisted single storey buildings (Hut J, Hut K and The Gatehouse at Gate C); creation of temporary hardstanding/vehicle parking area including erection of temporary gates, fences and security hut; re-orientation of existing scissor lift; removal of brickwork infill to exterior of doorway at basement level to east elevation; installation of external lighting, CCTV cameras and landscaping works' to read as follows: The gates, gate piers, railings and stone plinth at Gate C shall be reinstated in their original form and location, in accordance with the submitted Method Statement, by the end of July 2024 or within six months of the completion of the decant operation at Blythe House, whichever is sooner.' The proposal is to allow amendments to part of the wording of conditions 9, 17 and 18 to change from 'End of July 2023' to 'End of July 2024'.
Former Earls Court 2 Exhibition Centre Land, Empress Place London SW6 1TW
Installation of a temporary building for the purposes of a BBC exhibition for a 2 year period (excluding installation de-installation) and together with other associated and enabling works to include a gift shop, back of house and support facilities, external landscaping, boundary fencing, plant and vehicle servicing access and cycle parking arrangements.
Blythe House 23 Blythe Road London W14 0QX
Variation of wording of condition 10 of planning permission ref: 2018/01405/FUL granted 17th August 2018 for the 'Dismantling, salvage and later reinstatement of gates, gate piers and railings at Gate C; erection of temporary vehicle gates at Gate C in connection with temporary enlargement of crossover to Blythe Road; removal of selected gates and railings at Gate A; demolition of 3no unlisted single storey buildings (Hut J, Hut K and The Gatehouse at Gate C); creation of temporary hardstanding/vehicle parking area including erection of temporary gates, fences and security hut; re-orientation of existing scissor lift; removal of brickwork infill to exterior of doorway at basement level to east elevation; installation of external lighting, CCTV cameras and landscaping works' to read as follows: The gates, gate piers, railings and stone plinth at Gate C shall be reinstated in their original form and location, in accordance with the submitted Method Statement, by the end of July 2024 or within six months of the completion of the decant operation at Blythe House, whichever is sooner.
St Pauls Girls School Brook Green London W6 7BS
Demolition of the existing Rosalind Franklin Building (excluding boiler house arch and chimney) and erection of a new two storey Centre for Design and Innovation (CDI) adjacent to the retained boundary wall and new fencing to the rear of properties on Rowan Road; excavation to extend the CDI to the west; erection of a glazed link between the CDI and the Mercers Building to the south; refurbishment of the Mercers Building including removal of the fire escape stair and introduction of new overhead door; demolition of the existing Forum Building (excluding screen to science courtyard) and erection of a new three storey Staff Hub and link with the Main Building; enclosure of spaces between the Main Building and the Staff Hub and CDI buildings by erection of covered links; installation of solar photovoltaic panels and replacement of existing plant screen to the roof of the Celia Johnson building; landscaping of the car park including changes to the entrance gates and the erection of a new single storey maintenance building in the southeast corner of the car park; reconfiguration of some spaces in the Main Building over lower ground, upper ground and first floor for administration spaces, meeting spaces, pastoral spaces and toilet and locker space; landscaping works to the science courtyard and other associated works.
St Pauls Girls School Brook Green London W6 7BS
Demolition of the existing Rosalind Franklin Building (excluding boiler house arch and chimney) and erection of a new two storey Centre for Design and Innovation (CDI) adjacent to the retained boundary wall and new fencing to the rear of properties on Rowan Road; excavation to extend the CDI to the west; erection of a glazed link between the CDI and the Mercers Building to the south; refurbishment of the Mercers Building including removal of the fire escape stair and introduction of new overhead door; demolition of the existing Forum Building (excluding screen to science courtyard) and erection of a new three storey Staff Hub and link with the Main Building; enclosure of spaces between the Main Building and the Staff Hub and CDI buildings by erection of covered links; installation of solar photovoltaic panels and replacement of existing plant screen to the roof of the Celia Johnson building; landscaping of the car park including changes to the entrance gates and the erection of a new single storey maintenance building in the southeast corner of the car park; reconfiguration of some spaces in the Main Building over lower ground, upper ground and first floor for administration spaces, meeting spaces, pastoral spaces and toilet and locker space; landscaping works to the science courtyard and other associated works.