Rear Of 109 - 111 Fulham Palace Road London W6 8JA
Variation of condition 2 of planning permission ref: 2017/01548/FUL granted 9th July 2018 for the 'Demolition of the existing building and erection a three storey plus basement building for mixed use for one x one bedroom and two x two bedroom flats (Class C3 use), together with 70.4m2 of commercial office space (Class B1a use) and associated cycle and refuse stores' as amended by application ref: 2023/01656/NMAT to read as follows: 'Erection a three storey plus basement building for mixed use for 1x one bedroom and 2x two bedroom flats (use class C3), together with commercial office space (use class E) and associated cycle and refuse stores' to allow amendments to the approved drawings to include: alterations to the front lightwells, internal re-configuration of Flat 1 to change from a studio flat to a one bedroom flat, and re-location of the allocated bin and cycle store for Flat 2 into the communal bin and cycle store at ground floor level.
43 Brook Green London W6 7EF
Variation of condition 2 of planning permission ref: 2022/00949/FUL granted 13th July 2023 for the 'Erection of a part one/part two storey extension to the main building at roof level following removal of existing plant; plant enclosure at seventh floor level; three-storey tiered extension to the side and rear of the building at second, third and fourth floor levels; roof terraces at fifth and seventh floor levels; alterations to ground floor frontage and the first floor northern elevation; replacement windows; external alterations; provision of refuse storage at ground floor level and cycle storage at basement level, in connection with the provision of an additional 4,539sqm (GEA) of high grade Class E(g)(i) office space (16,301sqm (GEA) in total)' to allow amendments to the approved drawings to include: accommodate a larger substation within the existing building envelope on the ground floor; repositioning of doors and rooflights on the green roof of the second floor; repositioning of roof lights on the second, and fourth to seventh floor terraces/green roofs and roof level; brick detailing/infill added to part of east, north and south elevations; new louvre for basement smoke extract on south and north elevations; and reposition louvre on west elevation.
Westfield Square Ariel Way London
Variation of condition 1 (Temporary permission) of planning permission ref: 2022/03059/VAR granted 12th December 2022 for the 'Variation of condition 1 (Temporary permission) of planning permission ref: 2021/01130/FUL granted 8th June 2021 for the 'Use of land for the temporary siting of an 'Upside Down House' entertainment building and an 'Upside Down House' ticket office building for a period until 30th June 2022' to allow the continued use of the 'Upside Down House' entertainment building and an 'Upside Down House' ticket office building for a period until 1st December 2023', and allow the continued use of the 'Upside Down House' entertainment building and an 'Upside Down House' ticket office building for a period until 1st December 2025.
The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET
Hybrid application to include: 1. Demolition of existing buildings (except the Maltings and the façade of the Bottling Plant and former Hotel), walls, associated structures, site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site: 2. Detailed application for the works to the east side of Ship Lane which comprise: a. Alterations and extensions to existing buildings and erection of buildings varying in height from 3 to 9 storeys plus a basement of one to two storeys below ground to allow for residential apartments; flexible use floorspace for retail, financial and professional services, café/restaurant and drinking establishment uses, offices, non-residential institutions and community use and boathouse; Hotel / public house with accommodation; Cinema and Offices. b. New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works c. Provision of on-site cycle, vehicle and servicing parking at surface and basement level d. Provision of public open space, amenity and play space and landscaping e. Flood defence and towpath works f. Installation of plant and energy equipment 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise: a. The erection of a single storey basement and buildings varying in height from 3 to 8 storeys b. Residential development c. Provision of on-site cycle, vehicle and servicing parking d. Provision of public open space, amenity and play space and landscaping e. New pedestrian, vehicle and cycle accesses and internal routes, and associated highways works.
The Castle Centre Broomhouse Lane London SW6 3DP
Non-material amendment to planning permission ref: 2020/02024/VAR granted 11th March 2021 to allow amendments to the approved drawings to include: Basement Floor (Extension) - minor changes to the layout and partitions layout, Ground Floor (Extension) - change to nurse station and minor changes to partitions, First Floor (Extension) - change to nurse station and minor changes to partitions, Second Floor (Extension) - change to corridor and minor changes to partitions, Ground Floor (Listed Building) - change to bar in 'Great Hall', change to Bed 29 to reconfigure the en-suite and omit corridor and cupboard in hallway, and addition of cupboard to outside Bed 30, First Floor (Listed Building) - omit riser to Manager's office, amendment to partitions / bathroom in corridor 14 and change to door to outside of lift.
Unit 7 King Street Cloisters Clifton Walk London W6 0GY
Change of use of a four storey property, consisting of ground, first, second and third floor levels, from an office (Class E) into 4no. self-contained residential flats (Class C3), consisting of 1no. one bedroom two person flat, 2no. two bedroom four person flats, and 1no. two bedroom three person flat.
Site Bounded By 40 Liverpool Street, 50 Liverpool Street, Open Space From Liverpool Street (Hope Square) And Bishopsgate (Bishopsgate Square), And Sun Street Passage/Liverpool Street Bus Station At The Western Boundary London
Liverpool Street Station:Partial demolition of Station including concourse, train sheds and entrances to Bishopsgate, Liverpool Street and Sun Street Passage. Demolition of 50 Liverpool Street. Construction and remodelling of station at basement, lower and upperconcourses, new station roof, new entrances to Bishopsgate, Liverpool Street and Sun Street Passage, new lifts and escalators. Provision of units at basement, lower and upper concourse flrs for retail, café/restaurant, public house/bar. Remodelling of existing bus station and provision of a cycle hub on upper concourse. Andaz/Great Eastern Hotel:Alteration of existing building at basement, ground and upper flrs including insertion of new structure, creation of new west wall and removal and replacement of mansard roof. Change of use from hotel to office at part ground flr and across flrs 1-4; access to servicing area from vehicle lifts at flr 3; provision of units at basement and ground for retail, café/restaurant, and public house/bar; spaces for leisure and community uses; retail and café/restaurant at part of flr 5. Over Station Development:Erection of a new building above Liverpool Street Station and 40 Liverpool Street with maximum height of 108.6 metres AOD in height (excluding rooftop plant) comprising office use at flrs 5-13, and partly at flrs 14-15, with ancillary lobby and functions at flrs 3-4. New hotel at flrs 17-20 and partly within flrs 14-16, ancillary restaurant/bar at flr 15 and ancillary leisure facility at flr 16. New public amenity space at podium level comprising café/restaurant, retail, leisure; and partially at flr 16 comprising outdoor pool, leisure court and café/restaurant, alongside a publicly accessible roof garden. Provision of lifts, cycle parking, servicing, refuse, and plant.
Carlson Court 116 Putney Bridge Road London SW15 2NQ
Alterations, including partial demolition (retrospective) and rebuilding of existing three-storey building with the addition of a further two-storey upward extension on top, in connection with the provision of flexible Class 'E' commercial use, including office accommodation/employment hub, together with a café/restaurant space at ground floor and roof level, associated soft and hard landscaping, upgrading of central courtyard and provision of a roof top garden, provision of car parking spaces, cycle parking spaces, refuse storage and other associated works.
99 Bishopsgate London EC2M 3XD
The City of London Corporation has received a request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of the site known as 99 Bishopsgate. The proposed development comprises demolition of the existing buildings and erection of a new tower (240.5m AOD, 54 storeys excl. basement) and satellite buildings for office (Class E) (circa 97,000sq.m NIA), culture/community, retail and food and beverage uses (Class E) (circa 2000sq.m NIA); 3 basement levels, servicing access, and the provision of new public realm and landscaping and other associated works.
5 Erin Close London SW6 1BF
Change of use of the ground floor and basement floor level from office (Class E) into a one bedroom self-contained flat; infilling of existing garage doors with part brick and 2no windows at ground floor level to the front elevation; replacement of the existing window with a new enlarged window at basement level fronting Harwood Road elevation.