Hammersmith & Fulham Planning Applications

Found 10 planning applications

2023/02785/OBS | Observations to Other Borough

Site Bounded By 40 Liverpool Street, 50 Liverpool Street, Open Space From Liverpool Street (Hope Square) And Bishopsgate (Bishopsgate Square), And Sun Street Passage/Liverpool Street Bus Station At The Western Boundary London

Liverpool Street Station:Partial demolition of Station including concourse, train sheds and entrances to Bishopsgate, Liverpool Street and Sun Street Passage. Demolition of 50 Liverpool Street. Construction and remodelling of station at basement, lower and upperconcourses, new station roof, new entrances to Bishopsgate, Liverpool Street and Sun Street Passage, new lifts and escalators. Provision of units at basement, lower and upper concourse flrs for retail, café/restaurant, public house/bar. Remodelling of existing bus station and provision of a cycle hub on upper concourse. Andaz/Great Eastern Hotel:Alteration of existing building at basement, ground and upper flrs including insertion of new structure, creation of new west wall and removal and replacement of mansard roof. Change of use from hotel to office at part ground flr and across flrs 1-4; access to servicing area from vehicle lifts at flr 3; provision of units at basement and ground for retail, café/restaurant, and public house/bar; spaces for leisure and community uses; retail and café/restaurant at part of flr 5. Over Station Development:Erection of a new building above Liverpool Street Station and 40 Liverpool Street with maximum height of 108.6 metres AOD in height (excluding rooftop plant) comprising office use at flrs 5-13, and partly at flrs 14-15, with ancillary lobby and functions at flrs 3-4. New hotel at flrs 17-20 and partly within flrs 14-16, ancillary restaurant/bar at flr 15 and ancillary leisure facility at flr 16. New public amenity space at podium level comprising café/restaurant, retail, leisure; and partially at flr 16 comprising outdoor pool, leisure court and café/restaurant, alongside a publicly accessible roof garden. Provision of lifts, cycle parking, servicing, refuse, and plant.

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
20/10/2023
Demolition Construction Roof Office Shop House Shed Remodelling
2020/01455/VAR | Vary or Delete Conditions Full/Outline

Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met; to quantify the opacity of EDGP visible emissions; to reduce the maximum hours of operation of the EDGP; and to restrict EDGP testing to hours when the adjacent school's external amenity areas are not in use.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Vary or Delete Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
16/06/2020
Erection Variation Construction Roof Development Landscaping Residential Office
2022/00900/FUL | Full Detailed Planning Application

Flat Ground Floor 77 Macfarlane Road London W12 7JY

Creation of a temporary site construction compound in the rear garden of 77 Macfarlane Road in connection with the implementation of planning permission Ref. 2019/02691/VAR (granted 27.03.2020) at 66 Macfarlane Road, to include: demolition of existing boundary wall fronting Macfarlane Road and erection of 1.8m high timber hoarding with pedestrian access fronting Macfarlane Road and within the rear garden of no. 77, removal of existing garden shed and erection of two storey stacked office containers with external staircase, for a temporary period until February 2024. Reinstatement of the boundary wall and gate fronting Macfarlane Road, erection of replacement garden shed, replacement of boundary wall with no 79 and associated re-landscaping following completion of the construction works and removal of hoarding and office containers.

Local Authority
Hammersmith & Fulham
Type
Full planning consent (Full Detailed Planning Application)
Decision
Withdrawn (Application Withdrawn (Applicant/Agent))
Application Validated
04/04/2022
Erection Demolition Construction Landscaping Office Boundary Shed
2021/02682/OBS | Observations to Other Borough

Plot A01 Phase 3 Embassy Gardens Development Site 1-12 Ponton Road And 51 Nine Elms Lane Wandsworth SW18 5DA

Application under Section 73 of the Town and Country Planning Act (1990) (as amended) for a minor-material amendment to Condition 61 (in respect of Plot A01 Phase 3) of the Outline Planning Permission 2011/1815 (as amended) dated 30th of March 2012 for the "demolition of all existing buildings and construction of a mixed use redevelopment to provide residential units, including affordable housing, retail, financial and professional services, café/restaurant, bar and hot food takeaway uses, car showrooms, office floorspace and flexible workspace, a hotel, community uses and assembly and leisure uses, associated basement and ground level parking and servicing; energy centres; new vehicle and pedestrian access and circulation; and new public amenity space and landscaping including part of the 'Linear Park'." Proposal seeks amendments to the consented Parameter Plans and Development Specification Document as they relate to Plot A01 (Phase 3) of the outline consent.

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
12/08/2021
Demolition Amendment Construction Development Landscaping Residential Office Shop
2021/00261/OBS | Observations to Other Borough

2-3 Finsbury Avenue London EC2M 2PA

Demolition of the existing buildings and construction of a new building arranged over three basement levels, ground and 37 upper floors to provide an office-led, mixed use development comprising commercial, business and service uses (Class E), flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); and learning and non-residential institutions uses (Class F1); creation of a new pedestrian route through the site at ground floor level; hard and soft landscaping works; outdoor seating associated with ground level uses and other works incidental to the development. (The development would provide 85,009sq.m GEA of office floorspace (Class E); 4,397sq.m GEA of commercial, business and service uses (Class E); 1,097sq.m of flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); 2,239sq.m GEA of learning and non-residential institutions uses (Class F1); and 16,058sq.m of ancillary plant, back of house and storage; total floorspace 108,800sq.m GEA; overall height 170.290m AOD).

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
25/01/2021
Demolition Construction Development Landscaping Residential Office House
2020/03133/OBS | Observations to Other Borough

2-3 Finsbury Avenue London EC2M 2PA

Demolition of the existing buildings and construction of a new building arranged over three basement levels, ground and 37 upper floors to provide an office-led, mixed use development comprising commercial, business and service uses (Class E), flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); and learning and nonresidential institutions uses (Class F1); creation of a new pedestrian route through the site at ground floor level; hard and soft landscaping works; outdoor seating associated with ground level uses and other works incidental to the development. (The development would provide 85,009sq.m GEA of office floorspace (Class E); 4,397sq.m GEA of commercial, business and service uses (Class E); 1,097sq.m of flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); 2,239 sq.m GEA of learning and non-residential institutions uses (Class F1); and 16,058sq.m of ancillary plant, back of house and storage; total floorspace 108,800sq.m GEA; overall height 170.290m AOD).

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
25/11/2020
Demolition Construction Development Landscaping Residential Office House
2020/01579/OBS | Observations to Other Borough

1-2 Broadgate London City Of London EC2M 2QS

Application under section 73 of the Town and Country Planning Act 1990 to vary conditions 16, 17, 18, 19, 24, 45 & 46 of planning permission dated 28 March 2019 (18/01065/FULEIA) to incorporate minor material amendments for the demolition of the existing buildings and construction of an office-led mixed use building arranged over two basement levels, lower ground, upper ground and 12 upper floors plus rooftop plant to provide a mixture of flexible retail, leisure and mixed retail/leisure uses at lower levels and commercial uses at upper floor levels; hard and soft landscaping works; outdoor seating associated with ground level retail and other work incidental to the development (78,320sq.m GEA).

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
19/06/2020
Demolition Construction Development Landscaping Office Shop
2020/02048/OBS | Observations to Other Borough

2-3 Finsbury Avenue London EC2M 2PA

The redevelopment of the site would involve the demolition of the existing buildings and the construction of an office led, mixed use building up to an approximate maximum height of 170m above ordnance datum, comprising Approximately 100,000m2 GIA of office B1 space Approximately 1,900m2 GIA of flexible retail A1 A5 space Approximately 1,000m2 GIA of tenant dedicated lobby space Approximately 2,800m2 GIA of publicly accessible event space Sui Generis Servicing facilities, ancillary space, plant space, external terraces and associated landscaping. The building is expected to comprise three key elements: the Podium spanning from Ground Floor to Level 12, the West Tower providing up to 23 storeys, and the East Tower providing up to 37 storeys. The proposed development would also include three basement levels.

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
07/08/2020
Demolition Construction Development Landscaping Office Shop
2019/03563/RES | Submission of Reserved Matters

The Gateway Site White City Place 201 Wood Lane London W12

Reserved Matters Application relating to the approval of access, appearance, layout, scale and landscaping in respect of Phase 1 (Gateway Central building), for the construction of a 12 storey building with basement comprising Retail (Class A1) and a Hair Dressing and Beauty Training Academy at ground floor level with Offices (B1 Use) above, together with landscaping and associated works; and approval of basement only in respect of Phase 2 (Gateway West building), all pursuant to condition 2 (Reserved Matters Details) of the outline element of planning permission (2016/04452/COMB) dated 26 March 2018, as revised by planning permission (2019/02792/VAR) dated 11 June 2020. This application also seeks to discharge conditions 12 (Retail Amalgamation), 29 (Sustainability), 30 (Energy Strategy) and 56 (Townscape and Visual Impact Assessment) in respect of Phase 1 (Gateway Central building) of the development.

Local Authority
Hammersmith & Fulham
Type
Reserved matters (Submission of Reserved Matters)
Decision
Approved (Application Approved)
Application Validated
26/06/2020
Construction Development Landscaping Discharge Office Shop
2020/01698/NMAT | Non-Material Amendment Submission

Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

Non-material amendment to planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.' Amendments to include: Removal of perforated panels from the atrium on the east elevation (including removal of beam at level 1 and mullions of atrium glazing to be re-aligned to align with glazing into reception), change to panel layout - increasing the height of the upper-most panel to the base, addition of a door to the nitrogen store on the west elevation, addition of four louvres to the doors and two additional exposed louvres in the facade (colour matched to facade) on the north elevation.

Local Authority
Hammersmith & Fulham
Type
Application for non-material amendments following planning permission (Non-Material Amendment Submission)
Decision
Approved (Application Approved)
Application Validated
08/07/2020
Erection Amendment Construction Roof Development Landscaping Residential Office