102 Woodstock Road London W4 1EG
Installation of a white painted fence and two gates to the front, re-instate front chimney stack to front, erection of a single storey rear extension following demolition of the conservatory and installation of vertical bars to the windows in the rear roof extension of the house.
30 Mimosa Street London SW6 4DT
Removal of existing terrace fencing, staircase and structure from the second floor roof of back addition; erection of a dormer to house an internal staircase in the rear roofslope; erection of glass balustrades at main roof level in connection with its use as a terrace; installation of planter pockets on metal railings, re-location of boiler flue and timber decking at main roof level; installation of 2no air conditioning units at roof level, erection of external staircase and glass balustrades including timber decking above the second floor roof of back addition.
St Pauls Girls School Brook Green London W6 7BS
Demolition of the existing Rosalind Franklin Building (excluding boiler house arch and chimney) and erection of a new two storey Centre for Design and Innovation (CDI) adjacent to the retained boundary wall and new fencing to the rear of properties on Rowan Road; excavation to extend the CDI to the west; erection of a glazed link between the CDI and the Mercers Building to the south; refurbishment of the Mercers Building including removal of the fire escape stair and introduction of new overhead door; demolition of the existing Forum Building (excluding screen to science courtyard) and erection of a new three storey Staff Hub and link with the Main Building; enclosure of spaces between the Main Building and the Staff Hub and CDI buildings by erection of covered links; installation of solar photovoltaic panels and replacement of existing plant screen to the roof of the Celia Johnson building; landscaping of the car park including changes to the entrance gates and the erection of a new single storey maintenance building in the southeast corner of the car park; reconfiguration of some spaces in the Main Building over lower ground, upper ground and first floor for administration spaces, meeting spaces, pastoral spaces and toilet and locker space; landscaping works to the science courtyard and other associated works.
St Pauls Girls School Brook Green London W6 7BS
Demolition of the existing Rosalind Franklin Building (excluding boiler house arch and chimney) and erection of a new two storey Centre for Design and Innovation (CDI) adjacent to the retained boundary wall and new fencing to the rear of properties on Rowan Road; excavation to extend the CDI to the west; erection of a glazed link between the CDI and the Mercers Building to the south; refurbishment of the Mercers Building including removal of the fire escape stair and introduction of new overhead door; demolition of the existing Forum Building (excluding screen to science courtyard) and erection of a new three storey Staff Hub and link with the Main Building; enclosure of spaces between the Main Building and the Staff Hub and CDI buildings by erection of covered links; installation of solar photovoltaic panels and replacement of existing plant screen to the roof of the Celia Johnson building; landscaping of the car park including changes to the entrance gates and the erection of a new single storey maintenance building in the southeast corner of the car park; reconfiguration of some spaces in the Main Building over lower ground, upper ground and first floor for administration spaces, meeting spaces, pastoral spaces and toilet and locker space; landscaping works to the science courtyard and other associated works.