Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met; to quantify the opacity of EDGP visible emissions; to reduce the maximum hours of operation of the EDGP; and to restrict EDGP testing to hours when the adjacent school's external amenity areas are not in use.
Fulham Football Club Stevenage Road London SW6 6HH
Non-material amendment to planning permission ref: 2019/01880/VAR granted 19th May 2020 for the 'Material amendment to planning permission reference: 2017/04662/FUL granted 10th December 2018 for the: 'Demolition of the riverside stand and partial reconfiguration of the Putney stand western end and Hammersmith stand (Western end) and removal of four floodlight masts and the development of a new riverside stand providing two tiers of seating creating an overall seating capacity of up to 29,600 a new extended section of a riverside walkway basement leisure / retail provision for A1 A3 A4 A5 D2 use classes 9 serviced apartments (use class C1) parking a new river wall a temporary construction river platform and construction compound and associated landscaping including boundary work lighting including new and replacement floodlighting and ground works and all ancillary or incidental works and structures.' Amendments to include: change of the approved non-matchday uses at Levels 3, 4 and 5 of the Riverside Stand from function and event space Class E (Class D2 under the pre-August 2021 Use Class Order) to a members club (Sui Generis), and minor design alteration to the pergolas structures and bar unit designs on the roof terrace (Level 5).
La Reserve Hotel 422 - 428 Fulham Road London SW6 1DU
Submission of details of building contract and written notice of the start date for the demolition process pursuant to condition 3; temporary fencing pursuant to condition 4; Demolition Management Plan and a Demolition Logistics Plan pursuant to condition 6; Construction Management Plan and Construction Logistics Plan pursuant to condition 7; samples of all external materials pursuant to condition 8; drawings in plan, section and elevation pursuant to condition 9; all external ground and flat roof surfaces pursuant to condition 10; all proposed external lighting, including security lights, and the use shall not commence until the lighting pursuant to condition 11; proposed landscaping of the site, including planting schedules and details of the species, height and maturity of existing and new trees and shrubs pursuant to condition 17; site investigation scheme pursuant to condition 41 of planning permission ref: 2017/01128/FUL granted 23rd March 2018.
Hammersmith Town Hall King Street London W6 9JU
Non-Material amendment to approved application 2018/01500/FUL to amend the triggers for Conditions 32 (Ventilation Strategy) to enable below ground works ahead of formal discharge of these details. Changes to the triggers to Conditions 49 (Materials), 50 (Detailed Drawings) to enable construction to structural steelwork to the Town Hall and Town Hall roof extension ahead of formal discharge of these details. Changes to the trigger of Condition 51 (Landscaping and Public Realm) to refer to phasing plan. Amendments to the wording of Condition 11 (Archaeology) and Condition 67 (Airwaves Interference Study) to reflect the details already discharged and to clarify the remaining requirements.
Rear Of 68 Stamford Brook Road London W6 0XL
Submission of details of samples of all external facing and roofing materials pursuant to condition 3; Construction Method Statement pursuant to condition 4; hard and soft landscape works pursuant to condition 5 of planning permission ref: 2019/01437/FUL granted 4th July 2019.
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Non-material amendment to planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.' Amendments to include: Removal of perforated panels from the atrium on the east elevation (including removal of beam at level 1 and mullions of atrium glazing to be re-aligned to align with glazing into reception), change to panel layout - increasing the height of the upper-most panel to the base, addition of a door to the nitrogen store on the west elevation, addition of four louvres to the doors and two additional exposed louvres in the facade (colour matched to facade) on the north elevation.