Hammersmith & Fulham Planning Applications

Found 3 planning applications

2022/02111/NMAT | Non-Material Amendment Submission

104 King Street London W6 0QW

Non-material amendment to planning permission (ref: 2021/01039/VAR) dated 3 February 2022, for the development: 'Variation of Condition 2 (approved drawings) to allow minor material amendments to planning permission (ref: 2020/00646/FUL) dated 24 November 2020, for "The redevelopment of the site comprising the demolition and removal of the existing timber shed buildings, the retention of the existing office and former recording studio buildings and the development of part-basement, part-1, part-2, part-3 storey buildings, refurbishment of the office building and development of a first floor extension to the recording studio; to be used as office (Use Class B1), associated access works and cycle parking spaces'. In conjunction with minor external and internal alterations to the approved buildings, the amendments include: installation of new windows on south elevation and the reconfiguration of the plant enclosure at roof level (Block A), increase in parapet heights (infill elements) and reconfiguration to provide a brick clad boundary wall with the Cambridge Grove properties (Block B); and alterations to provide an enclosed bike store fronting Cambridge Grove (Building C).". Amendments sought relate to changes to the landscaping scheme (condition 27) by way of the addition of trees and landscaping.

Local Authority
Hammersmith & Fulham
Type
Application for non-material amendments following planning permission (Non-Material Amendment Submission)
Decision
Approved (Application Approved)
Application Validated
27/07/2022
Extension Alteration Demolition Variation Amendment Roof Development Landscaping Windows Trees Office Boundary Shed
2020/01849/FUL | Full Detailed Planning Application

50 Brook Green London W6 7BJ

Change of use from office to 33 residential units across Blocks 1-5; including partial demolition and extensions at ground/first floor to blocks 2/3, and at first floor in block 4. Partial demolition and alterations to block 5 and redevelopment of a 3-storey block; with associated bike storage, refuse storage, parking and landscaping and work to trees.

Local Authority
Hammersmith & Fulham
Type
Full planning consent (Full Detailed Planning Application)
Decision
Approved (Application Approved)
Application Validated
31/07/2020
Extension Alteration Demolition Landscaping Residential Trees Office
2020/01967/OBS | Observations to Other Borough

Peabody Estate St Johns Hill London SW11 1TY

Details Landscape General Arrangement plan, Tree Planting Plan, Hard Landscape, Plan, Walls& Boundaries Plan, Soft Landscape Schedule and Landscape Specifications pursuant to conditions 3 and 13 of planning permission dated 15/01/2019 ref 2017/5837 (Variation of condition 15 (in accordance with approved drawings) pursuant to planning permission dated 18/10/2012 ref 2012/1258 (Demolition of all existing buildings. Erection of 5 buildings of 4-12, 4-8, 7, 5-7 and 4-6 storeys to provide 527 residential units (135 x 1 bed, 261 x 2 bed,105 x 3 bed and 26 x 4 bed), with approx. 7800 square metres of private, communal & public space & public routes. Car parking (121 spaces within basement and 15 spaces at grade), 687 cycle parking spaces plus approximately 530 square metres of community space in the centre of the site and approximately 569 square metres of commercial space (classes A1-A5 (retail, financial and professional services, cafe/restaurant, take away, pub/bar and/or B1 office use) at the northern end of the site. Vehicular accesses from Comyn Rd and Eckstein Rd and emergency access from St John's Hill and Strath Terrace.) to allow: Plot 2: two storey increase allowing an additional 23 flats and change in tenure to older persons social rent only, removal of basement carparking; Planning Portal Re: PP-08149002 Plot 3: two storey increase to the centre tower allowing an additional 11 flats and change in tenure to private rent only; Plot 6: one storey increase allowing three additional flats; Plot 7: four additional flats (through internal reconfigurations); Plot 8: loss of one flat; Plot 9: One storey increase to the western section, extension of southern section facing Comyn Rd to close the building gap and removal of corner feature to Comyn Rd to allow 31 additional flats, inclusion of parking below podium level; General alterations to fenestration and finishes to accommodate changes and reconfiguration of carparking resulting in a loss of 28 spaces. Overall reco

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
31/07/2020
Extension Alteration Erection Demolition Variation Landscaping Windows Residential Trees Flat Office Shop