Imperial Wharf Marina Townmead Road London
Non-material amendment to planning permission (ref: 2016/01183/FUL) granted 2nd November 2017 for 'The construction of new moorings at Imperial Wharf, pontoon will measure 270m long x 2m wide and located parallel to the existing marina. The extension will add another 540m of additional berthing length to the marina. The pontoon will be serviced by the existing walkway with a linkspan/pontoon between the existing and proposed pontoons.' Amendments are to move the link bridge landing of the new moorings from the existing marina pontoon to the existing main pontoon. The length and area of the proposed and existing marinas remain the same.
Imperial Wharf Marina Townmead Road London
Non-material amendment to planning permission (ref: 2016/01183/FUL) dated 2nd November 2017 for "The construction of new moorings at Imperial Wharf, pontoon will measure 270m long x 2m wide and located parallel to the existing marina. The extension will add another 540m of additional berthing length to the marina. The pontoon will be serviced by the existing walkway with a linkspan/pontoon between the existing and proposed pontoons". Amendments are sought to vary the wording of Conditions 3 (Scour and Accretion Investigation); 4 (Scheme for ecological mitigation and enhancement); 6 (Operational Management Plan); 7 (Pontoon Design); 8 (Details of Moorings); 10 (Loading and Unloading Areas); 12 (Lighting Scheme); 13 (Navigational Risk Assessment); and 16 (Low Emissions Strategy), comprising changes to the triggers associated with the submission of details for approval by the Local Planning Authority, from "Prior to any construction works hereby permitted" to "Prior to any piling works hereby permitted".
Hammersmith Town Hall King Street London W6 9JU
Non-Material amendment to approved application 2018/01500/FUL to amend the triggers for Conditions 32 (Ventilation Strategy) to enable below ground works ahead of formal discharge of these details. Changes to the triggers to Conditions 49 (Materials), 50 (Detailed Drawings) to enable construction to structural steelwork to the Town Hall and Town Hall roof extension ahead of formal discharge of these details. Changes to the trigger of Condition 51 (Landscaping and Public Realm) to refer to phasing plan. Amendments to the wording of Condition 11 (Archaeology) and Condition 67 (Airwaves Interference Study) to reflect the details already discharged and to clarify the remaining requirements.