Burlington Danes School Wood Lane London W12 0HR
Alterations to existing Base Station at roof level to include: removal of existing rooftop antennas, ancillaries and associated support structures, installation of new upgraded replacement antennas, ancillaries and associated support structures, removal and replacement of equipment cabinets within an existing internal equipment room, installation of cabling and associated development thereto.
108 And 108A Old Oak Road London W3 7HG
Retention of a single storey rear extension, to the rear of the existing single storey back addition; and repositioning of existing rear garden steps; installation of 2 new rooflights within the flat roof of existing single storey back addition and associated alterations (amended development description).
99 Black Lion Lane London W6 9BG
Erection of an additional floor at roof level; erection of a rear extension at first floor level over part of the existing back addition and alterations to the roof of remaining back addition forming a flat roof; erection of a single storey rear extension, to the side and rear of the existing back addition; reposition of a rear window at second floor level serving the hall/stairs; replacement of the front boundary treatment with a low white painted wall and metal railings and gate to match neighbouring properties (amended development description).
Greenside Primary School Westville Road London W12 9PT
Installation of a new door and door entry system to the existing opening on the front elevation of the former caretaker's house; alterations to fenestration including new doors to the rear; creation of a new pathway leading from the proposed waiting area at the rear of the former caretaker's house to the schools hallway; refurbishment and repair works to existing fascia boards of the former caretakers home; associated external alterations in order to enable the use of the former caretaker's house as a new school visitors reception area (amended development description).
21 Rylett Crescent London W12 9RP
Alterations to the front boundary wall to include the installation of new railings on top of front boundary wall; low level planting behind railings; and metal gate (amended development description).