2023/02774/DET | Details to Meet Conditions Full/Outline

96 - 98 King Street London W6 0QW

Submission of details of an Air Quality Dust Management Plan (AQDMP) in order to mitigate air pollution prior to the commencement of the demolition phase of the development hereby permitted, pursuant to Condition 38; details of an Air Quality Dust Management Plan (AQDMP) in order to mitigate air pollution prior to the commencement of the construction phase of the development hereby permitted, pursuant to Condition 39; details of a preliminary risk assessment report, pursuant to Condition 40; details of a site investigation scheme, pursuant to Condition 41; details of a quantitative risk assessment report, pursuant to Condition 42; details of a remediation method statement, pursuant to Condition 43; details of a verification report confirming that the approved remediation method statement has been carried out in full, pursuant to Condition 44; and details of an onward long-term monitoring methodology report, pursuant to Condition 45 of planning application reference: 2021/00933/FUL, allowed on appeal (ref: APP/H5390/W/22/3290703) dated 5th April 2023.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Details to Meet Conditions Full/Outline)
Decision
Refused (Application Refused)
Application Validated
20/10/2023
Demolition Construction Development
2023/02111/DET | Details to Meet Conditions Full/Outline

1 - 24 Albany Court 1 Trenmar Gardens London NW10 6BR

Submission of a detailed report for the management of the construction of the development, pursuant to condition 3; and details of enhanced sound insulation, pursuant to condition 10 of the prior approval application ref: 2022/00698/PDA56 granted 15th September 2022.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Details to Meet Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
16/08/2023
Construction Development
2023/00706/DET | Details to Meet Conditions Full/Outline

Watermeadow Court Watermeadow Lane London

Details to discharge Condition 6 (Construction Management Plan and Construction Logistics Plan) for Phase 2 works, of Planning Permission (ref. 2022/00695/VAR) dated 10 March 2023. Watermeadow Court (Phase 2) - Construction Logistics Plan prepared by NRG Consulting Watermeadow Court (Phase 2) - Construction Management Plan prepared by NRG Consulting NB These documents have been written to address Phase 2 of the development only, which refers to all works done from after the end of the piling phase until handover.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Details to Meet Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
17/03/2023
Construction Development Discharge
2022/02011/DET | Details to Meet Conditions Full/Outline

168A Du Cane Road London W12 0TX

Submission of details of detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of external hard surfacing, paving, ramp and railings pursuant to condition 3; Construction Logistics Plan pursuant to condition 4; detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of a typical bay (including details of panelling, entrances, canopies and brise soleil) pursuant to condition 6; Details of external materials to be used in the development (including details of panelling, glazing, framing, canopies and brise soleil, external access ramp and roofing material) pursuant to condition 7; Ventilation Strategy Report pursuant to condition 13; final Sustainable Drainage System pursuant to condition 21; details of temporary alterations to the brick boundary wall and front boundary railings (including method statement) pursuant to Condition 23 of planning permission ref: 2021/02282/FUL granted 14th December 2021.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Details to Meet Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
14/07/2022
Alteration Construction Roof Development Boundary
2023/00426/DET | Details to Meet Conditions Full/Outline

284 - 288 North End Road London SW6 1NH

Submission of details of methods proposed to identify any television interference caused by the proposed development, including during the construction process, and the measures proposed to ensure that television interference that might be identified is remediated in a satisfactory manner pursuant to condition 44 of planning permission ref: 2021/01830/VAR granted 8th December 2022.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Details to Meet Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
20/02/2023
Construction Development
2021/04083/DET | Details to Meet Conditions Full/Outline

Fulham Gas Works Imperial Road London

Details for the discharge of Condition 7 (Demolition, Ground Enabling Works); Condition 8 (Temporary Fencing); Condition 25 (Construction Management Plan); Condition 26 (Construction Logistics Plan); Condition 30 (Integrated Water Management Plan) for Phase 3b (Development Plot E1), Phases 3c 3d (Development Plot E2) and Phases 3e 3f (Development Plot G), and the partial discharge of Condition 44 (Air Quality Dust Management Plan) for Phase 3b (Development Plot E1), Phases 3c 3d (Development Plot E2) and Phases 3e 3f (Development Plot G) of planning permission (Ref. 2018/02100/COMB) dated 8th February 2019.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Details to Meet Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
21/12/2021
Demolition Construction Development Discharge Fence
2022/02539/DET | Details to Meet Conditions Full/Outline

M&S White City Site 54 Wood Lane London W12 7RQ

Details of Sustainable Design and Construction Statement for Phase 3 of the development, in compliance with condition 45 of planning permission (ref. 2017/04377/VAR) dated 25 June 2018.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Details to Meet Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
06/09/2022
Construction Development
2020/01455/VAR | Vary or Delete Conditions Full/Outline

Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met; to quantify the opacity of EDGP visible emissions; to reduce the maximum hours of operation of the EDGP; and to restrict EDGP testing to hours when the adjacent school's external amenity areas are not in use.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Vary or Delete Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
16/06/2020
Erection Variation Construction Roof Development Landscaping Residential Office
2021/03838/DET | Details to Meet Conditions Full/Outline

4 - 5 Sotheron Place London SW6 2EJ

Submission of details of an Air Quality Dust Management Plan (AQDMP) prior to the commencement of each of the Demolition and Construction phases of the development, pursuant to Condition 25 of planning permission reference: 2020/01499/FUL dated 28th January 2021.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Details to Meet Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
30/11/2021
Demolition Construction Development
2022/00994/DET | Details to Meet Conditions Full/Outline

168A Du Cane Road London W12 0TX

Submission of details of detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of external hard surfacing, paving, ramp and railings pursuant to condition 3; Construction Logistics Plan pursuant to condition 4; detailed drawings of plan, section and elevation drawings (at a scale of 1:20) of a typical bay (including details of panelling, entrances, canopies and brise soleil) pursuant to condition 6; Details of external materials to be used in the development (including details of panelling, glazing, framing, canopies and brise soleil, external access ramp and roofing material) pursuant to condition 7; Ventilation Strategy Report pursuant to condition 13; final Sustainable Drainage System pursuant to condition 21; details of temporary alterations to the brick boundary wall and front boundary railings (including method statement) pursuant to Condition 23 of planning permission ref: 2021/02282/FUL granted 14th December 2021.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Details to Meet Conditions Full/Outline)
Decision
Refused (Application Refused)
Application Validated
07/04/2022