Hammersmith & Fulham Planning Applications

Found 197 planning applications

2023/01943/VAR | Vary or Delete Conditions Full/Outline

Rear Of 109 - 111 Fulham Palace Road London W6 8JA

Variation of condition 2 of planning permission ref: 2017/01548/FUL granted 9th July 2018 for the 'Demolition of the existing building and erection a three storey plus basement building for mixed use for one x one bedroom and two x two bedroom flats (Class C3 use), together with 70.4m2 of commercial office space (Class B1a use) and associated cycle and refuse stores' as amended by application ref: 2023/01656/NMAT to read as follows: 'Erection a three storey plus basement building for mixed use for 1x one bedroom and 2x two bedroom flats (use class C3), together with commercial office space (use class E) and associated cycle and refuse stores' to allow amendments to the approved drawings to include: alterations to the front lightwells, internal re-configuration of Flat 1 to change from a studio flat to a one bedroom flat, and re-location of the allocated bin and cycle store for Flat 2 into the communal bin and cycle store at ground floor level.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Vary or Delete Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
03/08/2023
Alteration Erection Demolition Variation Flat Office
2023/02600/VAR | Vary or Delete Conditions Full/Outline

Westfield Square Ariel Way London

Variation of condition 1 (Temporary permission) of planning permission ref: 2022/03059/VAR granted 12th December 2022 for the 'Variation of condition 1 (Temporary permission) of planning permission ref: 2021/01130/FUL granted 8th June 2021 for the 'Use of land for the temporary siting of an 'Upside Down House' entertainment building and an 'Upside Down House' ticket office building for a period until 30th June 2022' to allow the continued use of the 'Upside Down House' entertainment building and an 'Upside Down House' ticket office building for a period until 1st December 2023', and allow the continued use of the 'Upside Down House' entertainment building and an 'Upside Down House' ticket office building for a period until 1st December 2025.

Local Authority
Hammersmith & Fulham
Type
Outline planning consent (Vary or Delete Conditions Full/Outline)
Decision
Approved (Application Approved)
Application Validated
27/10/2023
Variation Office
2023/02996/OBS | Observations to Other Borough

The Stag Brewery Lower Richmond Road Mortlake London SW14 7ET

Hybrid application to include: 1. Demolition of existing buildings (except the Maltings and the façade of the Bottling Plant and former Hotel), walls, associated structures, site clearance and groundworks, to allow for the comprehensive phased redevelopment of the site: 2. Detailed application for the works to the east side of Ship Lane which comprise: a. Alterations and extensions to existing buildings and erection of buildings varying in height from 3 to 9 storeys plus a basement of one to two storeys below ground to allow for residential apartments; flexible use floorspace for retail, financial and professional services, café/restaurant and drinking establishment uses, offices, non-residential institutions and community use and boathouse; Hotel / public house with accommodation; Cinema and Offices. b. New pedestrian, vehicle and cycle accesses and internal routes, and associated highway works c. Provision of on-site cycle, vehicle and servicing parking at surface and basement level d. Provision of public open space, amenity and play space and landscaping e. Flood defence and towpath works f. Installation of plant and energy equipment 3. Outline application, with all matters reserved for works to the west of Ship Lane which comprise: a. The erection of a single storey basement and buildings varying in height from 3 to 8 storeys b. Residential development c. Provision of on-site cycle, vehicle and servicing parking d. Provision of public open space, amenity and play space and landscaping e. New pedestrian, vehicle and cycle accesses and internal routes, and associated highways works.

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
16/11/2023
Extension Alteration Erection Demolition Development Landscaping Residential Flat Accommodation Office Shop House
2023/02917/NMAT | Non-Material Amendment Submission

The Castle Centre Broomhouse Lane London SW6 3DP

Non-material amendment to planning permission ref: 2020/02024/VAR granted 11th March 2021 to allow amendments to the approved drawings to include: Basement Floor (Extension) - minor changes to the layout and partitions layout, Ground Floor (Extension) - change to nurse station and minor changes to partitions, First Floor (Extension) - change to nurse station and minor changes to partitions, Second Floor (Extension) - change to corridor and minor changes to partitions, Ground Floor (Listed Building) - change to bar in 'Great Hall', change to Bed 29 to reconfigure the en-suite and omit corridor and cupboard in hallway, and addition of cupboard to outside Bed 30, First Floor (Listed Building) - omit riser to Manager's office, amendment to partitions / bathroom in corridor 14 and change to door to outside of lift.

Local Authority
Hammersmith & Fulham
Type
Application for non-material amendments following planning permission (Non-Material Amendment Submission)
Decision
Approved (Application Approved)
Application Validated
08/11/2023
Extension Amendment Office
2023/02785/OBS | Observations to Other Borough

Site Bounded By 40 Liverpool Street, 50 Liverpool Street, Open Space From Liverpool Street (Hope Square) And Bishopsgate (Bishopsgate Square), And Sun Street Passage/Liverpool Street Bus Station At The Western Boundary London

Liverpool Street Station:Partial demolition of Station including concourse, train sheds and entrances to Bishopsgate, Liverpool Street and Sun Street Passage. Demolition of 50 Liverpool Street. Construction and remodelling of station at basement, lower and upperconcourses, new station roof, new entrances to Bishopsgate, Liverpool Street and Sun Street Passage, new lifts and escalators. Provision of units at basement, lower and upper concourse flrs for retail, café/restaurant, public house/bar. Remodelling of existing bus station and provision of a cycle hub on upper concourse. Andaz/Great Eastern Hotel:Alteration of existing building at basement, ground and upper flrs including insertion of new structure, creation of new west wall and removal and replacement of mansard roof. Change of use from hotel to office at part ground flr and across flrs 1-4; access to servicing area from vehicle lifts at flr 3; provision of units at basement and ground for retail, café/restaurant, and public house/bar; spaces for leisure and community uses; retail and café/restaurant at part of flr 5. Over Station Development:Erection of a new building above Liverpool Street Station and 40 Liverpool Street with maximum height of 108.6 metres AOD in height (excluding rooftop plant) comprising office use at flrs 5-13, and partly at flrs 14-15, with ancillary lobby and functions at flrs 3-4. New hotel at flrs 17-20 and partly within flrs 14-16, ancillary restaurant/bar at flr 15 and ancillary leisure facility at flr 16. New public amenity space at podium level comprising café/restaurant, retail, leisure; and partially at flr 16 comprising outdoor pool, leisure court and café/restaurant, alongside a publicly accessible roof garden. Provision of lifts, cycle parking, servicing, refuse, and plant.

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
20/10/2023
Demolition Construction Roof Office Shop House Shed Remodelling
2023/02761/OBS | Observations to Other Borough

Carlson Court 116 Putney Bridge Road London SW15 2NQ

Alterations, including partial demolition (retrospective) and rebuilding of existing three-storey building with the addition of a further two-storey upward extension on top, in connection with the provision of flexible Class 'E' commercial use, including office accommodation/employment hub, together with a café/restaurant space at ground floor and roof level, associated soft and hard landscaping, upgrading of central courtyard and provision of a roof top garden, provision of car parking spaces, cycle parking spaces, refuse storage and other associated works.

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
19/10/2023
Extension Alteration Demolition Roof Landscaping Accommodation Office Retrospective
2023/02717/OBS | Observations to Other Borough

99 Bishopsgate London EC2M 3XD

The City of London Corporation has received a request for an EIA Scoping Opinion under regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 for the redevelopment of the site known as 99 Bishopsgate. The proposed development comprises demolition of the existing buildings and erection of a new tower (240.5m AOD, 54 storeys excl. basement) and satellite buildings for office (Class E) (circa 97,000sq.m NIA), culture/community, retail and food and beverage uses (Class E) (circa 2000sq.m NIA); 3 basement levels, servicing access, and the provision of new public realm and landscaping and other associated works.

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
17/10/2023
Erection Demolition Development Landscaping Office Shop
2023/02594/OBS | Observations to Other Borough

Feltham Corporation Centre Plane Tree Crescent Feltham TW13 7HF

Outline planning permission with the details of access, appearance, landscaping, layout and scale reserved for later determination. A demolition phase and phased redevelopment each phase being an independent act of development comprising data centre use B8 of up to 46,750 sqm GEA, including ancillary offices, internal plant and equipment including flues, and substation. In addition to the above the Development will include car parking.provision of external plant and equipment including flues creation of servicing areas and provision of associated services, including waste, refuse, cycle storage, and lighting; and for the laying out of the buildings routes and open spaces within the development; and all associated works and operations including but not limited to: demolition; earthworks provision of attenuation infrastructure, engineering operations. Development shall be in accordance with the approved Development Parameters Schedule and Plans.

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
06/10/2023
Demolition Development Landscaping Office
2023/02245/FUL | Full Detailed Planning Application

Garden Flat 36 Hammersmith Grove London W6 7HA

Retention of a single storey outbuilding in the rear garden to use as home office/study ancillary to Ground Floor Flat.

Local Authority
Hammersmith & Fulham
Type
Full planning consent (Full Detailed Planning Application)
Decision
Approved (Application Approved)
Application Validated
01/09/2023
Office House
2023/02348/NMAT | Non-Material Amendment Submission

Hammersmith Town Hall King Street London W6 9JU

Non-material amendment to approved Application (Ref: 2018/01500/FUL granted 22 October 2019) relating to the Demolition of 181-187 King Street, Town Hall Extension, Quaker Meeting House 20 Nigel Playfair Avenue (West), Register Office Nigel Playfair Avenue (West) and remainder of former Cineworld 207 King Street. Redevelopment, to include the Nigel Playfair Avenue (West) Car Park and Nigel Playfair Avenue (East), to provide four new build blocks comprising existing and new basements plus between six and eight storeys in height comprising 204 dwelling units (Class C3), retail (Class A1), Restaurant/café use (Class A3), Cinema (Class D2) and Office (Class B1) to include enterprise units; internal and external alterations and roof extension of the Grade II Listed Town Hall building to provide refurbished civic centre and new office use (Class B1); creation of a civic square and public realm works, play space, landscaping and associated residential and non-residential car parking (including disabled), cycle parking, motorcycle parking, access and servicing (EIA Development). Internal and external amendments to new build elements (Block A, C and D) including changes to terracotta panel sizes, winter gardens, windows, and cores.

Local Authority
Hammersmith & Fulham
Type
Application for non-material amendments following planning permission (Non-Material Amendment Submission)
Decision
Approved (Application Approved)
Application Validated
08/09/2023
Extension Alteration Demolition Amendment Roof Development Dwelling Landscaping Windows Residential Office Shop House