Former BBC Television Centre Wood Lane London
Installation of 2no. new rigid canopy frames at external terrace of 10th floor.
St John's Church Walham Green North End Road London SW6 1PB
Replacement of existing uPVC hoppers and downpipes with new cast iron rainwater goods and to locate the new hoppers above the existing stringcourse at gutter level to the southern and northern elevations of the building.
The Swan 46 Hammersmith Broadway London W6 0DZ
Replacement of existing 2no. microcell antennas with 4no. new microcell antennas, installation of ancillary equipment cabinets within the building and associated external alterations.
Latymer Preparatory School Rivercourt House 36 Upper Mall London W6 9TA
Alterations to the Seahorse Studio including the installation of new stringer and handrail to existing staircase; erection of balustrades and passing gates to southern elevation.
Godolphin And Latymer School Iffley Road London W6 0PG
External alterations to the eastern facade of the old Music Building, including replacement of the existing single glazed metal windows with Powder Coated Aluminium windows; installation of timber cladding over the precast pebble panels to match the timber cladding of the adjacent new Music Building; and decoration of the concrete surrounds.
The Black Lion 2 South Black Lion Lane London W6 9TJ
Retention of astro turf and 3no marquees in the side garden (for a temporary period of 1 year), retention of new stud wall and door to outdoor kitchen and retention of a bin store at the rear of the property; erection of a new boundary wall with railings on top to the side elevation; installation of a new gate to rear side elevation; internal alterations to include retention of decorations and refurbishment of ladies and gents WC, decorations and refurbishment of the fixed furniture and walls at ground floor level, and vinyls applied to internal glazing to shopfront windows; associated internal alterations.
Chaplain's Garden Fulham Palace Bishop's Avenue London SW6 6EA
Retention of existing marquee for a temporary 12 month period commencing January 2022.
St Pauls Girls School Brook Green London W6 7BS
The installation of 3 no. demountable freestanding Jumbrellas in the Science Courtyard and 1 no. demountable freestanding shelter in front of the Garden Building The total area covered be the above is 108 sq m divided into 4 separate spaces
The Black Lion 2 South Black Lion Lane London W6 9TJ
Installation of a new timber door to replace the existing window at first floor level and erection of an external staircase from ground floor to first floor level at the side of the main building.
Walkabout Inn Including Part Of The Dorsett Hotel 56 And 58 Shepherd's Bush Green London W12 8QE
Minor external alterations consisting of relocation of dry riser inlet box on the south elevation in conjunction with major works covered under Listed Building Consent ref: 2018/02059/VLBC, to allow dry riser access to remain external and accessible to the London Fire Brigade, with the inlet being moved along the elevation closer to Shepherd's Bush Green and the location of the existing inlet to be repaired and made good.