Hammersmith & Fulham Planning Applications

Found 16 planning applications

2020/03133/OBS | Observations to Other Borough

2-3 Finsbury Avenue London EC2M 2PA

Demolition of the existing buildings and construction of a new building arranged over three basement levels, ground and 37 upper floors to provide an office-led, mixed use development comprising commercial, business and service uses (Class E), flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); and learning and nonresidential institutions uses (Class F1); creation of a new pedestrian route through the site at ground floor level; hard and soft landscaping works; outdoor seating associated with ground level uses and other works incidental to the development. (The development would provide 85,009sq.m GEA of office floorspace (Class E); 4,397sq.m GEA of commercial, business and service uses (Class E); 1,097sq.m of flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); 2,239 sq.m GEA of learning and non-residential institutions uses (Class F1); and 16,058sq.m of ancillary plant, back of house and storage; total floorspace 108,800sq.m GEA; overall height 170.290m AOD).

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
25/11/2020
Demolition Construction Development Landscaping Residential Office House
2020/01579/OBS | Observations to Other Borough

1-2 Broadgate London City Of London EC2M 2QS

Application under section 73 of the Town and Country Planning Act 1990 to vary conditions 16, 17, 18, 19, 24, 45 & 46 of planning permission dated 28 March 2019 (18/01065/FULEIA) to incorporate minor material amendments for the demolition of the existing buildings and construction of an office-led mixed use building arranged over two basement levels, lower ground, upper ground and 12 upper floors plus rooftop plant to provide a mixture of flexible retail, leisure and mixed retail/leisure uses at lower levels and commercial uses at upper floor levels; hard and soft landscaping works; outdoor seating associated with ground level retail and other work incidental to the development (78,320sq.m GEA).

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
19/06/2020
Demolition Construction Development Landscaping Office Shop
2020/02048/OBS | Observations to Other Borough

2-3 Finsbury Avenue London EC2M 2PA

The redevelopment of the site would involve the demolition of the existing buildings and the construction of an office led, mixed use building up to an approximate maximum height of 170m above ordnance datum, comprising Approximately 100,000m2 GIA of office B1 space Approximately 1,900m2 GIA of flexible retail A1 A5 space Approximately 1,000m2 GIA of tenant dedicated lobby space Approximately 2,800m2 GIA of publicly accessible event space Sui Generis Servicing facilities, ancillary space, plant space, external terraces and associated landscaping. The building is expected to comprise three key elements: the Podium spanning from Ground Floor to Level 12, the West Tower providing up to 23 storeys, and the East Tower providing up to 37 storeys. The proposed development would also include three basement levels.

Local Authority
Hammersmith & Fulham
Type
Other (Observations to Other Borough)
Decision
Approved (No Objection to Proposal (OBS only))
Application Validated
07/08/2020
Demolition Construction Development Landscaping Office Shop
2019/03563/RES | Submission of Reserved Matters

The Gateway Site White City Place 201 Wood Lane London W12

Reserved Matters Application relating to the approval of access, appearance, layout, scale and landscaping in respect of Phase 1 (Gateway Central building), for the construction of a 12 storey building with basement comprising Retail (Class A1) and a Hair Dressing and Beauty Training Academy at ground floor level with Offices (B1 Use) above, together with landscaping and associated works; and approval of basement only in respect of Phase 2 (Gateway West building), all pursuant to condition 2 (Reserved Matters Details) of the outline element of planning permission (2016/04452/COMB) dated 26 March 2018, as revised by planning permission (2019/02792/VAR) dated 11 June 2020. This application also seeks to discharge conditions 12 (Retail Amalgamation), 29 (Sustainability), 30 (Energy Strategy) and 56 (Townscape and Visual Impact Assessment) in respect of Phase 1 (Gateway Central building) of the development.

Local Authority
Hammersmith & Fulham
Type
Reserved matters (Submission of Reserved Matters)
Decision
Approved (Application Approved)
Application Validated
26/06/2020
Construction Development Landscaping Discharge Office Shop
2020/01698/NMAT | Non-Material Amendment Submission

Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR

Non-material amendment to planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.' Amendments to include: Removal of perforated panels from the atrium on the east elevation (including removal of beam at level 1 and mullions of atrium glazing to be re-aligned to align with glazing into reception), change to panel layout - increasing the height of the upper-most panel to the base, addition of a door to the nitrogen store on the west elevation, addition of four louvres to the doors and two additional exposed louvres in the facade (colour matched to facade) on the north elevation.

Local Authority
Hammersmith & Fulham
Type
Application for non-material amendments following planning permission (Non-Material Amendment Submission)
Decision
Approved (Application Approved)
Application Validated
08/07/2020
Erection Amendment Construction Roof Development Landscaping Residential Office
2020/01375/NMAT | Non-Material Amendment Submission

Fulham Football Club Stevenage Road London SW6 6HH

Non-material amendment to planning permission ref: 2019/01880/VAR granted 12th May 2020 for the 'Material amendment to planning permission reference: 2017/04662/FUL granted 10th December 2018 for the: 'Demolition of the riverside stand and partial reconfiguration of the Putney stand western end and Hammersmith stand ( Western end) and removal of four floodlight masts and the development of a new riverside stand providing two tiers of seating creating an overall seating capacity of up to 29,600 a new extended section of a riverside walkway basement leisure / retail provision for A1 A3 A4 A5 D2 use classes 9 serviced apartments (use class C1) parking a new river wall a temporary construction river platform and construction compound and associated landscaping including boundary work lighting including new and replacement floodlighting and ground works and all ancillary or incidental works and structures.' Amendments sought are for the re-configuration together with internal and external alterations to the Riverside stand to facilitate a health club at the Putney End including; relocation of five serviced apartments from the Putney end to the Hammersmith end; relocation of a heat and power system at basement level; amended design of screening at level 5 of the Riverside Stand; alteration to the internal layout of cycle parking and re-siting of enclosed cycle parking adjacent to the ground floor of proposed health club; removal of backup generator; relocation of Putney Stand compactor to level 1 of riverside stand and associated minor internal and external alterations.' Amendments to include lowering of part of the approved metal cladding design on the western end of the southern Putney Stand elevation.

Local Authority
Hammersmith & Fulham
Type
Application for non-material amendments following planning permission (Non-Material Amendment Submission)
Decision
Approved (Application Approved)
Application Validated
03/06/2020
Alteration Demolition Amendment Construction Development Landscaping Flat Shop Boundary