2-3 Finsbury Avenue London EC2M 2PA
The redevelopment of the site would involve the demolition of the existing buildings and the construction of an office led, mixed use building up to an approximate maximum height of 170m above ordnance datum, comprising Approximately 100,000m2 GIA of office B1 space Approximately 1,900m2 GIA of flexible retail A1 A5 space Approximately 1,000m2 GIA of tenant dedicated lobby space Approximately 2,800m2 GIA of publicly accessible event space Sui Generis Servicing facilities, ancillary space, plant space, external terraces and associated landscaping. The building is expected to comprise three key elements: the Podium spanning from Ground Floor to Level 12, the West Tower providing up to 23 storeys, and the East Tower providing up to 37 storeys. The proposed development would also include three basement levels.
The Gateway Site White City Place 201 Wood Lane London W12
Reserved Matters Application relating to the approval of access, appearance, layout, scale and landscaping in respect of Phase 1 (Gateway Central building), for the construction of a 12 storey building with basement comprising Retail (Class A1) and a Hair Dressing and Beauty Training Academy at ground floor level with Offices (B1 Use) above, together with landscaping and associated works; and approval of basement only in respect of Phase 2 (Gateway West building), all pursuant to condition 2 (Reserved Matters Details) of the outline element of planning permission (2016/04452/COMB) dated 26 March 2018, as revised by planning permission (2019/02792/VAR) dated 11 June 2020. This application also seeks to discharge conditions 12 (Retail Amalgamation), 29 (Sustainability), 30 (Energy Strategy) and 56 (Townscape and Visual Impact Assessment) in respect of Phase 1 (Gateway Central building) of the development.
Fulham Football Club Stevenage Road London SW6 6HH
Non-material amendment to planning permission ref: 2019/01880/VAR granted 12th May 2020 for the 'Material amendment to planning permission reference: 2017/04662/FUL granted 10th December 2018 for the: 'Demolition of the riverside stand and partial reconfiguration of the Putney stand western end and Hammersmith stand ( Western end) and removal of four floodlight masts and the development of a new riverside stand providing two tiers of seating creating an overall seating capacity of up to 29,600 a new extended section of a riverside walkway basement leisure / retail provision for A1 A3 A4 A5 D2 use classes 9 serviced apartments (use class C1) parking a new river wall a temporary construction river platform and construction compound and associated landscaping including boundary work lighting including new and replacement floodlighting and ground works and all ancillary or incidental works and structures.' Amendments sought are for the re-configuration together with internal and external alterations to the Riverside stand to facilitate a health club at the Putney End including; relocation of five serviced apartments from the Putney end to the Hammersmith end; relocation of a heat and power system at basement level; amended design of screening at level 5 of the Riverside Stand; alteration to the internal layout of cycle parking and re-siting of enclosed cycle parking adjacent to the ground floor of proposed health club; removal of backup generator; relocation of Putney Stand compactor to level 1 of riverside stand and associated minor internal and external alterations.' Amendments to include lowering of part of the approved metal cladding design on the western end of the southern Putney Stand elevation.