St Pauls Girls School Brook Green London W6 7BS
Demolition of the existing Rosalind Franklin Building (excluding boiler house arch and chimney) and erection of a new two storey Centre for Design and Innovation (CDI) adjacent to the retained boundary wall and new fencing to the rear of properties on Rowan Road; excavation to extend the CDI to the west; erection of a glazed link between the CDI and the Mercers Building to the south; refurbishment of the Mercers Building including removal of the fire escape stair and introduction of new overhead door; demolition of the existing Forum Building (excluding screen to science courtyard) and erection of a new three storey Staff Hub and link with the Main Building; enclosure of spaces between the Main Building and the Staff Hub and CDI buildings by erection of covered links; installation of solar photovoltaic panels and replacement of existing plant screen to the roof of the Celia Johnson building; landscaping of the car park including changes to the entrance gates and the erection of a new single storey maintenance building in the southeast corner of the car park; reconfiguration of some spaces in the Main Building over lower ground, upper ground and first floor for administration spaces, meeting spaces, pastoral spaces and toilet and locker space; landscaping works to the science courtyard and other associated works.
St Pauls Girls School Brook Green London W6 7BS
Demolition of the existing Rosalind Franklin Building (excluding boiler house arch and chimney) and erection of a new two storey Centre for Design and Innovation (CDI) adjacent to the retained boundary wall and new fencing to the rear of properties on Rowan Road; excavation to extend the CDI to the west; erection of a glazed link between the CDI and the Mercers Building to the south; refurbishment of the Mercers Building including removal of the fire escape stair and introduction of new overhead door; demolition of the existing Forum Building (excluding screen to science courtyard) and erection of a new three storey Staff Hub and link with the Main Building; enclosure of spaces between the Main Building and the Staff Hub and CDI buildings by erection of covered links; installation of solar photovoltaic panels and replacement of existing plant screen to the roof of the Celia Johnson building; landscaping of the car park including changes to the entrance gates and the erection of a new single storey maintenance building in the southeast corner of the car park; reconfiguration of some spaces in the Main Building over lower ground, upper ground and first floor for administration spaces, meeting spaces, pastoral spaces and toilet and locker space; landscaping works to the science courtyard and other associated works.
61 Richmond Way London W14 0AS
Submission of details and samples of all external facing and finishing materials, pursuant to Condition 3; details of a Demolition Method Statement and Construction Management Plan, pursuant to Condition 4; details of a Demolition and Construction Logistics Plan, pursuant to Condition 5; details of measures for the protection during the construction period of the sycamore tree within the site curtilage, pursuant to Condition 6; details and a sample of obscure glass for the glazed panel on the southern elevation of the new dwelling hereby permitted, pursuant to Condition 7; details of the hard and soft landscaping of all areas external to the building, including planting and paving, detailed drawings at a scale of not less than 1:20 of fences, gates and other means of enclosure, pursuant to Condition 12; details of a scheme for temporary fencing and/or enclosure of the site where necessary, pursuant to Condition 13; details of the Ultra-Low NOx Gas fired boilers to be provided for space heating and hot water, pursuant to Condition 20; and details of a noise assessment, pursuant to Condition 21 of planning permission reference: 2018/03512/FUL dated 8th May 2019.
61 Richmond Way London W14 0AS
Submission of details and samples of all external facing and finishing materials, pursuant to Condition 3; details of a Demolition Method Statement and Construction Management Plan, pursuant to Condition 4; details of a Demolition and Construction Logistics Plan, pursuant to Condition 5; details of measures for the protection during the construction period of the sycamore tree within the site curtilage, pursuant to Condition 6; details and a sample of obscure glass for the glazed panel on the southern elevation of the new dwelling hereby permitted, pursuant to Condition 7; details of the hard and soft landscaping of all areas external to the building, including planting and paving, detailed drawings at a scale of not less than 1:20 of fences, gates and other means of enclosure, pursuant to Condition 12; details of a scheme for temporary fencing and/or enclosure of the site where necessary, pursuant to Condition 13; details of a preliminary risk assessment report, pursuant to Condition 14; details of a site investigation scheme, pursuant to Condition 15; details of a quantitative risk assessment report, pursuant to Condition 16; details of a remediation method statement, pursuant to Condition 17; details of a verification report confirming that the approved remediation method statement has been carried out in full, pursuant to Condition 18; details of an onward long-term monitoring methodology report, pursuant to Condition 19; details of the Ultra-Low NOx Gas fired boilers to be provided for space heating and hot water, pursuant to Condition 20; and details of a noise assessment, pursuant to Condition 21 of planning permission reference: 2018/03512/FUL dated 8th May 2019.