Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Variation of the wording of condition 33 of planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations'. Amendments are proposed to the wording of parts b and c of condition 33 in order to delete references to NOx emissions standards for CHP units (which are not part of the approved development) and the Emergency Diesel Generator Plant (EDGP), along with the use of abatement for the EDGP if the emissions standards cannot be met; to quantify the opacity of EDGP visible emissions; to reduce the maximum hours of operation of the EDGP; and to restrict EDGP testing to hours when the adjacent school's external amenity areas are not in use.
Plot A01 Phase 3 Embassy Gardens Development Site 1-12 Ponton Road And 51 Nine Elms Lane Wandsworth SW18 5DA
Application under Section 73 of the Town and Country Planning Act (1990) (as amended) for a minor-material amendment to Condition 61 (in respect of Plot A01 Phase 3) of the Outline Planning Permission 2011/1815 (as amended) dated 30th of March 2012 for the "demolition of all existing buildings and construction of a mixed use redevelopment to provide residential units, including affordable housing, retail, financial and professional services, café/restaurant, bar and hot food takeaway uses, car showrooms, office floorspace and flexible workspace, a hotel, community uses and assembly and leisure uses, associated basement and ground level parking and servicing; energy centres; new vehicle and pedestrian access and circulation; and new public amenity space and landscaping including part of the 'Linear Park'." Proposal seeks amendments to the consented Parameter Plans and Development Specification Document as they relate to Plot A01 (Phase 3) of the outline consent.
2-3 Finsbury Avenue London EC2M 2PA
Demolition of the existing buildings and construction of a new building arranged over three basement levels, ground and 37 upper floors to provide an office-led, mixed use development comprising commercial, business and service uses (Class E), flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); and learning and non-residential institutions uses (Class F1); creation of a new pedestrian route through the site at ground floor level; hard and soft landscaping works; outdoor seating associated with ground level uses and other works incidental to the development. (The development would provide 85,009sq.m GEA of office floorspace (Class E); 4,397sq.m GEA of commercial, business and service uses (Class E); 1,097sq.m of flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); 2,239sq.m GEA of learning and non-residential institutions uses (Class F1); and 16,058sq.m of ancillary plant, back of house and storage; total floorspace 108,800sq.m GEA; overall height 170.290m AOD).
2-3 Finsbury Avenue London EC2M 2PA
Demolition of the existing buildings and construction of a new building arranged over three basement levels, ground and 37 upper floors to provide an office-led, mixed use development comprising commercial, business and service uses (Class E), flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); and learning and nonresidential institutions uses (Class F1); creation of a new pedestrian route through the site at ground floor level; hard and soft landscaping works; outdoor seating associated with ground level uses and other works incidental to the development. (The development would provide 85,009sq.m GEA of office floorspace (Class E); 4,397sq.m GEA of commercial, business and service uses (Class E); 1,097sq.m of flexible commercial, business and service uses /drinking establishment uses (Class E/Sui Generis); 2,239 sq.m GEA of learning and non-residential institutions uses (Class F1); and 16,058sq.m of ancillary plant, back of house and storage; total floorspace 108,800sq.m GEA; overall height 170.290m AOD).
Site Of Former Cyclotron Building And Land Adjacent,Hammersmith Hospital,Du Cane Road, London W12 0NN; Land At Linford Christie Stadium,Artillery Way,Du Cane Road,London W12 0DF; Land At Burlington Danes Academy,Wood Lane,London, W12 0HR
Non-material amendment to planning permission Ref.2018/03667/FUL granted 24th October 2019 for the 'Erection of a part two storey/part nine storey building with plant at ground floor, eighth floor and roof level to provide a biomedical research centre including specialised laboratory and research space, associated offices and support spaces (Class B1 research and development/Class D1 non-residential education institution, 12,045sqm total floorspace), seventh floor external terrace on the eastern side of the building; relocated substation; external cycle storage; associated landscaping; temporary use of adjacent part of Ark Burlington Danes Academy playing field and adjacent part of Linford Christie Stadium land for temporary construction access and logistics operations.' Amendments to include: Removal of perforated panels from the atrium on the east elevation (including removal of beam at level 1 and mullions of atrium glazing to be re-aligned to align with glazing into reception), change to panel layout - increasing the height of the upper-most panel to the base, addition of a door to the nitrogen store on the west elevation, addition of four louvres to the doors and two additional exposed louvres in the facade (colour matched to facade) on the north elevation.