Land Rear Of Unit 4 Marlborough Drive Fleckney Leicestershire
Erection of 10 units for employment use E(g)(iii), B2 and B8 (reserved matters of 21/02059/VAC including details of access, appearance, landscaping, layout and scale) and discharge of conditions 5 (materials), 7 (construction traffic/site traffic management plan), 9 (tree protection plan), 11 (layout and landscaping), 12 (landscape management plan), 16 (submission of WSI and mitigation), 18 details of storage of refuse and materials for recycling) 21 (surface water drainage), 22 Management of surface water on site during construction), 23 (surface water maintenance) and 24 (Infiltration testing).
Land Rear Of Unit 4 Marlborough Drive Fleckney Leicestershire
Erection of one Unit for use B2 and B8 with ancillary office space (use E(g)(i)) (reserved matters of 21/02059/VAC) and discharge of conditions 5 (materials), 7 (construction traffic/site traffic management plan), 9 (tree protection plan), 11 (landscaping), 12 (landscape management plan), 16 (Archaeology), 18 (storage of refuse and materials for recycling), 21 (surface water drainage scheme), 22 (management of surface water on site during construction), 23 (maintenance of sustainable surface water drainage system) and 24 (infiltration testing) of 21/02059/VAC.
Nubrook House Brook Lane Great Easton Leicestershire LE16 8SJ
Discharge of Conditions 6 (Landscaping Scheme), 7 (Tree Protection), 11 (Archaeology), 12 (Surface Water Drainage Scheme), 13 (Surface Water During Construction), 14 (Drainage Maintenance Scheme) and 15 (Infiltration Testing) of 19/00837/VAC
Eyebrook Reservoir Great Easton Road Caldecott Leicestershire
Construction of an auxiliary spillway, a formal toe drain and collection manholes; reprofiling of small section of existing internal road; reuse of excavated materials and associated reprofiling of land within the site; installation of a temporary access bridge and site compound for use during the construction period; tree felling; new landscaping, planting and reprofiling of land to create a biodiversity enhancement area; and ancillary engineering works