West End Farm West End Bitteswell Leicestershire LE17 4SE
Discharge of Conditions 5 (Materials), 6 (Levels), 7 (Boundary Treatment), 8 (Drainage), 9 (Parking and turning facilities),10 (Construction traffic/Construction Site Management Plan), 11 (Tree/Hedgerow Protection), 14 (Archaeological Mitigation Strategy) and 19 (Parking) of 18/01280/OUT
Land Off Church Causeway Church Langton Leicestershire
Discharge of Conditions 9 (eastern boundary hedgerow), 12 (biodiversity management plan), 14 (powerline relocation), 15 (storage facilities for refuse and recycling), 16 (construction method statement), 18 (surface water), 19 (construction surface water management plan), 20 (SuDS maintenance plan & schedule), 21 (infiltration testing), 22 (foul drainage), 23 (archaeological WIS) and 34 (site drainage) of 18/00904/OUT
Garden Centre Adjacent 80 Dunton Road Broughton Astley Leicestershire LE9 6NA
Discharge of Conditions 6 (Levels), 7 (Boundary Treatment), 8 (Foul and Surface Water Drainage), 9 (Construction Surface Water Management), 10 (SuDS Maintenance), 11 (Parking/Turning/Visibility Splays) and 12 (Construction Management Plan) of 17/01197/OUT
Land Adj Honeypot Farm Honeypot Lane Husbands Bosworth Leicestershire
Discharge of Conditions 5 (materials), 6 (eaves and verge detail), 7 (joinery details), 8 (existing and proposed levels), 9 (boundary treatment), 10 (surface water drainage scheme), 11 (surface water during construction) and 15 (protection of trees and hedgerows) of 18/00056/OUT
Land At Langton Road Great Bowden Leicestershire
Discharge of conditions 1 (reserved matters application), 4 (levels), 5 (boundary and surface treatments), 6 (materials), 7 (landscaping), 8 (landscape management plan), 10 (construction management plan), 12 (refuse and recycling), 13 (foul water drainage), 14 (surface water management strategy, 20 (noise attenuation) of 17/00416/OUT
Car Park High Street Fleckney Leicestershire
Discharge of conditions 2 (materials), 3 (boundary treatment), 4 (levels), 6 (Risk Based Land Contamination Assessment), 8 (drainage), 13 (surface water drainage), 16 (landscaping), 22 (Construction Management Plan), 23 (lighting) of 17/02146/FUL