Woodlock Holt Lane Hook Hampshire RG27 9EL
Erection of a four bedroom dwelling within residential garden of existing dwelling, together with gravel driveway and parking area, and boundary fence.
60 Wordsworth Avenue Yateley Hampshire GU46 6YR
Change of use of amenity land to residential amenity space and erection of new boundary fence (part retrospective).
Hartland Park Bramshot Lane Fleet Hampshire
Approval of details reserved by condition 14 -woodland management plan- 15- Arboricultural Implications Assessment- 16- Tree Protection Fencing- 17- Foul Drainage- 18- Details of Sustainable Urban Drainage System- 19- Surface Water Drainage Phase 2 Development- 20- Surface Water, Groundwater and Drainage- 22- Noise Mitigation Measures- 26- Management and Maintenance of Streets- 27- Street Sections- 28- Pedestrian and Cycleway provision- 29- Estate Street Phasing and Completion Plan- 32- Sustainable Building Performance- 34- Lighting Scheme- 38- Long Term Management of Foul and Surface Drainage- pursuant to (Phase 2) 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.
60 Wordsworth Avenue Yateley Hampshire GU46 6YR
Change of use of amenity land to residential amenity space and erection of new boundary fence (part retrospective).
3 Arlott Close Eversley Hook Hampshire RG27 0RT
Change of use of amenity land to ancillary residential garden and the erection of a 1.8m high fence and 0.8m high sleeper retaining wall (retrospective).
6 Bow Field Hook Hampshire RG27 9SA
Change of use of amenity land to residential amenity space and erection of new boundary fence. Extension to existing hardstanding to allow the parking of an additional vehicle.