Millfield Farmhouse Wellhouse Lane Bramshill Hook Hampshire RG27 0RJ
Installation of a ground mounted solar photovoltaic array comprising 20kWp of solar panels (52 panels) secured using a 1m high stock fence and screened using 1m high hedges comprising of various native species of shrubs and bushes
Hartland Park Ively Road Fleet Hampshire
Discharge of conditions concerning Development Phase 3: 14 - Woodland Management Plan - 15 - Arboricultural Implications Assessment and Arboricultural Method Statement - 16 - Tree Protection Fencing - 17 - Foul Drainage - 18 - Sustainable Urban Drainage System - 19 - Surface Water Drainage - 20 - Surface Water, Groundwater and Drainage - 26 - Management and Maintenance of Streets - 28 - Pedestrian and Cycleway Provision Along Principal Roads - and 32(a) - Energy and Sustainability Strategy, pursuant to 17/00471/OUT, Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment.
Hunting Lodge Bagwell Lane Odiham Hook Hampshire RG29 1JG
Works to the Hunting Lodge grounds: replace failed fencing, security cameras, new lighting on the main facade, underground cesspit, gabion to solve subsidence, dismantling and like-for-like rebuilding of East Pavilion and Greenhouse
Hunting Lodge Bagwell Lane Odiham Hook Hampshire RG29 1JG
Works to the Hunting Lodge grounds: replace failed fencing, security cameras, new lighting on the main facade, underground cesspit, gabion to solve subsidence, dismantling and like-for-like rebuilding of East Pavilion and Greenhouse
8 Benford Court Buryfields Odiham Hook Hampshire RG29 1NE
1. Sycamore - Lift low branches to approximately 5 - 6 metres from ground level over hanging Bowling Club and Tennis Club fences and footpaths. This will be by the removal of sub-lateral branches only as detailed in the attached photos. What3words - including.ghosts.examiner. Please note no lifting will be done over the grassed area to the rear of 8 Benford Court
Land Lying To The North Of Vicarage Lane Hound Green Hook Hampshire
Discharge of Condition no. 7 (details of foundations and supporting structures) pursuant to planning permission (ref: 21/02749/FUL) for construction of a temporary 17.87 MW Solar Farm, to include the installation of Solar Panels with LV switch/transformer, customer switchgear/T Boot enclosure, a DNO substation enclosure, security fencing, landscaping and other associated infrastructure
Sub-Station Tweseldown Road Church Crookham Fleet Hampshire
Material change of use to garden land (including removal of decommissioned sub-station) and replacement of existing 1.8m fence with 2.3m fence.
14 Frogmore Road Blackwater Camberley GU17 0NP
Discharge of conditions 1 (Time Limit), 2 (Approved Plans), 3 (Materials) and 4 (Submission Of Details Of Fence/Trellis) pursuant to 23/01023/HOU - installation of decking to rear of property (retrospective).
1 Kukri Gardens Church Crookham Fleet Hampshire GU52 8EU
Change of use of land to residential, realignment of fence and alterations to roof and doors of decommissioned sub station to allow its use as a utility/garden/storage building.
Naishes Wood SANG Naishes Lane Church Crookham Fleet Hampshire
T1. Oak Tree - Cut back to fence line