8 Fir Tree Way Fleet Hampshire GU52 7NB
1. T1. Tag #4206, Oak - fell 3rd stem and undertake deadwood removal to the remaining 2 healthy stems Tree comprises 2 healthy stems of 400mm+ dia, and a 3rd stem of 200-250mm. The 3rd stem has a very sparse crown showing signs of major die back and evidence of decay at a height of approximately 4 metres within the main stem. 2. T2. Tag #4207, Mature twin stemmed Oak - Undertake deadwood removal only. 3. T3. Tag#4208 Mature Scots Pine - Undertake deadwood removal only 4. T4. Tag# 4209 Semi mature Oak - Fell approximately 300mm dia, tree is being shaded by more mature trees resulting in a thin crown and noticeable lean, root system is causing damage to fence posts. tree has little amenity or habitat value; fell tree. 5. T5. Tag# 4210, Mature twin Stemmed Oak -lift crown by 4 metres and reduce crown by 3 -4 metres. deadwood to be removed during reduction works. Tree has thick low hanging canopy, impeding use of the private garden and likely to make contact with dwelling in 2 -3 years that may result in damage to a roof.
32 St Legers Way Riseley Reading Hampshire RG7 1GH
T23 English oak: prune to give no more than 2m clearance from the fabric of the dwelling. T25 & T26 English oaks: Lateral crown reduction of their southern canopies only, to no higher than 6.5m above ground level, and no further than the garden boundary fence line. Remove deadwood as necessary.
Land On The North Side Of Dunleys Hill Odiham Hook Hampshire
Change of use of agricultural land (part of 'The Deer Park') to public and private open spaces with associated new footpath/cycleway; revised vehicular access off Dunleys Hill with adjoining new footpath/cycleway; fencing, tree planting and landscaping to the public and private open spaces. Construction 13 residential dwellings focused around a courtyard area and including 4 affordable units. Access driveways, fencing and landscaping; all land on north of Dunleys Hill and Odiham
The Barn Old Potbridge Road Winchfield Hook Hampshire RG27 8BT
Approval of conditions 4- tree plan- 5- drainage- and 6- Construction Method Statement- pursuant to 19/01789/FUL Demolition of existing outbuilding and erection of a detached four bedroom dwelling, detached double garage, fencing and 6m wide gates and creation of a driveway and new access
Hartland Park Bramshot Lane Fleet Hampshire
Approval of details reserved by condition 14 -woodland management plan- 15- Arboricultural Implications Assessment- 16- Tree Protection Fencing- 17- Foul Drainage- 18- Details of Sustainable Urban Drainage System- 19- Surface Water Drainage Phase 2 Development- 20- Surface Water, Groundwater and Drainage- 22- Noise Mitigation Measures- 26- Management and Maintenance of Streets- 27- Street Sections- 28- Pedestrian and Cycleway provision- 29- Estate Street Phasing and Completion Plan- 32- Sustainable Building Performance- 34- Lighting Scheme- 38- Long Term Management of Foul and Surface Drainage- pursuant to (Phase 2) 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.