Land On The North Side Of Dunleys Hill Odiham Hook Hampshire
Change of use of agricultural land (part of 'The Deer Park') to public and private open spaces with associated new footpath/cycleway; revised vehicular access off Dunleys Hill with adjoining new footpath/cycleway; fencing, tree planting and landscaping to the public and private open spaces. Construction 13 residential dwellings focused around a courtyard area and including 4 affordable units. Access driveways, fencing and landscaping; all land on north of Dunleys Hill and Odiham
Corner Cottage Dipley Road Hartley Wintney Hook Hampshire RG27 8JP
Demolition of existing greenhouse, stables and shed and associated hardstandings and erection of detached dwelling with fence and gates, and associated parking, access and landscaping.
Hartland Park Bramshot Lane Fleet Hampshire
Approval of details reserved by condition 14 -woodland management plan- 15- Arboricultural Implications Assessment- 16- Tree Protection Fencing- 17- Foul Drainage- 18- Details of Sustainable Urban Drainage System- 19- Surface Water Drainage Phase 2 Development- 20- Surface Water, Groundwater and Drainage- 22- Noise Mitigation Measures- 26- Management and Maintenance of Streets- 27- Street Sections- 28- Pedestrian and Cycleway provision- 29- Estate Street Phasing and Completion Plan- 32- Sustainable Building Performance- 34- Lighting Scheme- 38- Long Term Management of Foul and Surface Drainage- pursuant to (Phase 2) 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.
Nutley Eversley Road Yateley GU46 7RH
Amended description - variation of condition 2 included Variation of conditions 2,7 and 10 and removal of condition 8 attached to Planning Permission Application 19/02783/FUL dated 13/02/2020. Retention of existing crossover to improve exit from site via exiting crossover. Condition 7. Amendment to condition to retain existing drop kerb and crossover in addition to new entrance. Condition 8. Removal of condition to allow existing crossover to be retained. Condition 10. Amendment to landscaping plan to make use of existing crossover. Amendment to replace proposed picket fencing to front elevation with low brick wall in brick to match dwelling.
Corner Cottage Dipley Road Hartley Wintney Hook Hampshire RG27 8JP
Demolition of existing greenhouse and stables, removal of shed and erection of a detached three bedroom dwelling with fence and gates and associated parking, access and landscaping