Hartland Park Ively Road Fleet Hampshire
Discharge of conditions concerning Development Phase 3: 14 - Woodland Management Plan - 15 - Arboricultural Implications Assessment and Arboricultural Method Statement - 16 - Tree Protection Fencing - 17 - Foul Drainage - 18 - Sustainable Urban Drainage System - 19 - Surface Water Drainage - 20 - Surface Water, Groundwater and Drainage - 26 - Management and Maintenance of Streets - 28 - Pedestrian and Cycleway Provision Along Principal Roads - and 32(a) - Energy and Sustainability Strategy, pursuant to 17/00471/OUT, Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment.
Land On The North Side Of Dunleys Hill Odiham Hook Hampshire
Change of use of agricultural land (part of 'The Deer Park') to public and private open spaces with associated new footpath/cycleway; revised vehicular access off Dunleys Hill with adjoining new footpath/cycleway; fencing, tree planting and landscaping to the public and private open spaces. Construction 13 residential dwellings focused around a courtyard area and including 4 affordable units. Access driveways, fencing and landscaping; all land on north of Dunleys Hill and Odiham
Hartland Park Bramshot Lane Fleet Hampshire
Approval of details reserved by condition 14 -woodland management plan- 15- Arboricultural Implications Assessment- 16- Tree Protection Fencing- 17- Foul Drainage- 18- Details of Sustainable Urban Drainage System- 19- Surface Water Drainage Phase 2 Development- 20- Surface Water, Groundwater and Drainage- 22- Noise Mitigation Measures- 26- Management and Maintenance of Streets- 27- Street Sections- 28- Pedestrian and Cycleway provision- 29- Estate Street Phasing and Completion Plan- 32- Sustainable Building Performance- 34- Lighting Scheme- 38- Long Term Management of Foul and Surface Drainage- pursuant to (Phase 2) 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.