Cherry Tree Farm Chandlers Green Mattingley Hook Hampshire RG27 8LH
Change of use of a portion of the land and buildings at Cherry Tree Farm from agricultural to equestrian use, together with construction of tack room, covered horse walker, manege, soil and grass bund and fencing around manege, open/machinery barn and car parking.
Land At Watery Lane Church Crookham Fleet Hampshire
Amendment to positioning, boundary treatments/ landscaping and garden arrangements at plots 21-26 and 39-42 pursuant to 17/00264/REM Reserved matters application for appearance, landscaping, layout and scale pursuant to 14/00504/MAJOR: Outline planning application for up to 300 residential units, land for up to 1,050m2 D1 floorspace for a GP surgery including pharmacy and up to 370m2 A1 retail floorspace for a convenience foodstore and associated access, open space, playing pitches including a sports pavilion, MUGA and car park, landscaping, Suitable Alternative Natural Greenspace (SANG) including car park and improvements to the A287/Redlands Lane junction. Approval of details submitted in connection with the following conditions: 8 - Levels, 9 - Road construction details, 10 - Access and parking details, 16 - Badger surveys, 17 - Flood lighting, 18 - Ecological Management Plan, 19 - Surface Water Management Plan, 20 - Protection for Basingstoke Canal SSSI, 21 - Buffer zone for River Hart, 24 - Tree protection, 25 - Hard and soft landscaping, 26 - Landscape Management Plan, 30 - Drainage Strategy, 34 - Surface Water Drainage Scheme, 36 - Sport pitch parking demand assessment
The Close 133 High Street Odiham Hook Hampshire RG29 1NW
1. T4 Lime - Repollard to 11m Tree in extensive decline. ganoderma fruit bodies at base and run up western side of trunk. cavitys and decay throughout. work necessary to maintain safe presence of this tree in the local enviroment. 2. T2, T3, T9 Yew - Fell one sided crowns due to proximity of other trees, shading neighbouring property, due to phototropism overhanging drive and obstructing construction of new gates(Planning permission granted) and access to drive. A yew hedge to be planted in mitigation of loss.
28 St Cross Road Crondall Farnham Hampshire GU10 5PG
Approval of Conditions 3- construction method statement- 4- materials- 5- trees- and 6- landscaping- pursuant to 22/01247/FUL Construction of a two bedroom dwelling with new access from Chaundlers Croft (following demolition of existing conservatory and two outbuildings) and bike store to serve host dwelling
The Stables Darwins Farm Hillside Odiham Hook Hampshire RG29 1HX
Approval of Conditions 3- external materials- 4- Construction Method Statement- 5- Tree Protection- 6- Landscaping- and 7- Ecological Enhancement Plan- pursuant to 21/00896/FUL Erection of a 7 bedroom dwelling and garage with associated parking, turning, landscaping, boundary treatments and private amenity space following demolition of existing 2 bedroom dwelling garage and store
Land North Of Netherhouse Copse Hitches Lane Fleet Hampshire
Discharge of conditions no.7 (levels), no.8 (Construction details of roads, footways, accesses and drainage) and no.16 (tree, hedgerow and shrub protection) for development phase 2 pursuant to outline planning permission (ref:16/01651/OUT) for up to 423 residential dwellings and a community facility. Associated vehicular, pedestrian and cycle access, drainage and landscape works, including provision of public open space and sports pitches. Provision of country park/SANG as an extension to Edenbrook Country Park.
14 Frogmore Road Blackwater Camberley Hampshire GU17 0NP
Discharge of Conditions no.3 (demolition and construction management plan), no.4 (tree protection), no.5 (external materials), no.6 (surface water drainage) and no.7 (ecological enhancement plan) pursuant to planning permission (ref:21/01881/FUL) for demolition of existing detached bungalow and shed, garage reduction and erection of a four bedroom detached dwelling with one bedroom annex and associated works.
Countryside Services Workshop Old Pump House Close Fleet Hampshire GU51 3DN
Approval of Conditions 3- CEMP- 4- Construction Management Plan- and 5- tree protection- pursuant to 20/03004/FUL Widening of the northern footway and the provision of a slipway from Boathouse Corner
Land On The North Side Of Dunleys Hill Odiham Hook Hampshire
Change of use of agricultural land (part of 'The Deer Park') to public and private open spaces with associated new footpath/cycleway; revised vehicular access off Dunleys Hill with adjoining new footpath/cycleway; fencing, tree planting and landscaping to the public and private open spaces. Construction 13 residential dwellings focused around a courtyard area and including 4 affordable units. Access driveways, fencing and landscaping; all land on north of Dunleys Hill and Odiham
Highfield Park Church Lane Heckfield Hook Hampshire RG27 0LG
Approval of condition 3- Tree Protection Plan-pursuant to 21/00859/FUL Construction of a gazebo