28 St Cross Road Crondall Farnham Hampshire GU10 5PG
Approval of Conditions 3- construction method statement- 4- materials- 5- trees- and 6- landscaping- pursuant to 22/01247/FUL Construction of a two bedroom dwelling with new access from Chaundlers Croft (following demolition of existing conservatory and two outbuildings) and bike store to serve host dwelling
The Stables Darwins Farm Hillside Odiham Hook Hampshire RG29 1HX
Approval of Conditions 3- external materials- 4- Construction Method Statement- 5- Tree Protection- 6- Landscaping- and 7- Ecological Enhancement Plan- pursuant to 21/00896/FUL Erection of a 7 bedroom dwelling and garage with associated parking, turning, landscaping, boundary treatments and private amenity space following demolition of existing 2 bedroom dwelling garage and store
The Old Dairy White Lane Greywell Hook RG29 1TL
Approval of Condition 7- ecological management plan- and 9- trees- pursuant to 18/00765/FUL Partial demolition and conversion of existing agricultural buildings to provide a day health spa facility. Creation of secondary access road, provision of car parking, landscaping and planting
All Saints Church Church Road Fleet GU51 4NB
Approval of conditions 3- Demolition and construction method statement- 4- Materials - 5- Landscape and 6- Trees pursuant to 19/00631/FUL Demolitions, extension, external alterations and associated works to All Saints Church, including: - Demolition of existing extensions constructed against the north elevation of the Church, comprising Choir Vestry and entrance to boiler room and Lady Chapel built 1958; - Erection of a single storey Annexe on north elevation of the Church; - Alterations to the west elevation to provide a new west entrance; - Reinstatement of roofs Chancel, Nave, North and South Aisle and original Clergy Vestry; - Alterations to rainwater goods; - Construction of new vehicle layby; and - Hard and soft landscaping.
Hartland Park Bramshot Lane Fleet Hampshire
Approval of details reserved by condition 14 -woodland management plan- 15- Arboricultural Implications Assessment- 16- Tree Protection Fencing- 17- Foul Drainage- 18- Details of Sustainable Urban Drainage System- 19- Surface Water Drainage Phase 2 Development- 20- Surface Water, Groundwater and Drainage- 22- Noise Mitigation Measures- 26- Management and Maintenance of Streets- 27- Street Sections- 28- Pedestrian and Cycleway provision- 29- Estate Street Phasing and Completion Plan- 32- Sustainable Building Performance- 34- Lighting Scheme- 38- Long Term Management of Foul and Surface Drainage- pursuant to (Phase 2) 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.
Broden Stables Redlands Lane Crondall Farnham GU10 5RF
Approval of condition 8 - Tree Protection Measures and method statement- pursuant to 16/02377/FUL Demolition of the existing stable building, arena, floodlights and hardstanding, and the erection of 30 residential dwellings, with associated access, landscaping, and car parking arrangements.