Land North Of Netherhouse Copse Hitches Lane Fleet Hampshire
Discharge of conditions no.7 (levels), no.8 (Construction details of roads, footways, accesses and drainage) and no.16 (tree, hedgerow and shrub protection) for development phase 2 pursuant to outline planning permission (ref:16/01651/OUT) for up to 423 residential dwellings and a community facility. Associated vehicular, pedestrian and cycle access, drainage and landscape works, including provision of public open space and sports pitches. Provision of country park/SANG as an extension to Edenbrook Country Park.
Meadows Business Park Station Approach Blackwater Camberley Hampshire GU17 9AB
Approval of Condition 3- tree protection- pursuant to 21/02406/FUL Building 2 - Erection of a single storey rear extension with terrace at first floor and door to access, single storey side extension, pergola to front, alterations to fenestration to ground floor front and rear and removal of refuse enclosure Building 3 - Insertion of seven new windows in side elevation, three new windows in rear elevation, four new windows in other side elevation. Creation of cycle hub in car park, relocation of refuse stores, and associated landscaping enhancement
Business Park Ively Road Farnborough Hampshire
Approval of Condition 3- tree protection- pursuant to 21/01886/FUL Erection of an extension to A105 Data Centre, a visitor reception centre, water treatment plant, reconfiguration of car park, drainage infrastructure, landscaping and associated works.
All Saints Church Church Road Fleet GU51 4NB
Approval of conditions 3- Demolition and construction method statement- 4- Materials - 5- Landscape and 6- Trees pursuant to 19/00631/FUL Demolitions, extension, external alterations and associated works to All Saints Church, including: - Demolition of existing extensions constructed against the north elevation of the Church, comprising Choir Vestry and entrance to boiler room and Lady Chapel built 1958; - Erection of a single storey Annexe on north elevation of the Church; - Alterations to the west elevation to provide a new west entrance; - Reinstatement of roofs Chancel, Nave, North and South Aisle and original Clergy Vestry; - Alterations to rainwater goods; - Construction of new vehicle layby; and - Hard and soft landscaping.