Sainsburys Griffin Way North Hook Hampshire RG27 9HZ
Amend condition 1 to refer to updated site layout plan, amend condition 7 to refer to updated soft-landscaping plan and remove reference to tree-pits, remove condition 14 to reflect change in design to delivery gate pursuant to 20/01162/AMCON Variation of Conditions 1, 6, 7, 9, 17, 28, 29, 32, 33, 35 and 36 attached to Planning Permission 13/01145/MAJOR dated 02/06/2014 to vary the wording of the conditions.
Heckfield Barn Basingstoke Road Heckfield Hook RG27 0LN
Variation of Condition 2 (Materials), Condition 4 (Hard and Soft Landscaping), Condition 8 (Vehicle Parking), Condition 11 (Energy Performance) and Condition 13 (List of Approved Drawings) attached to planning permission 08/00084/FUL (appeal reference APP/N1730/A/08/2076453) dated 02/12/2008, as amended by non-material minor amendment (ref: 22/02406/NMMA). The amendments proposed are: - Increase to height of the building by 1.5m - Two storey side addition to the rear projection of the building - Introduction of front roof extension and two dormers to rear projection - Alterations to openings to front elevation of building, rear elevation of rear projection and introduction of 4 windows and two doorways (fire exits) - Installation of three roof lights - 332 sqm of floorspace at 1st floor for ancillary spaces to car showroom
Land Between Moulsham Lane And Broome Close Yateley Hampshire
Seeking approval to move the bridge adjacent to plot 147 pursuant to 20/02368/AMCON Variation of Condition 2 attached to Planning Permission 17/02793/REM dated 05/04/2018 to allow the relocation of the proposed SANG car park (Revised landscaping details received)
Fleetwood Lodge Reading Road North Fleet Hampshire GU51 4AR
Approval of Condition 5- landscaping and tree protection- pursuant to 21/02648/AMCON Variation of Condition 2 attached to Planning Permission 20/00418/FUL dated 10/06/2020 to allow the raising of the ground levels (Updated landscaping plans received 04.10.2022)
1 All Saints Cottage Fernhill Lane Blackwater Camberley GU17 9HE
Variation of Condition 1, Condition 6 and Condition 8 attached to Planning Permission 21/00436/AMCON dated 22.04.2021 to alter the landscaping, the change in detail is limited to the reduction in height of 3 trees on the highway verge and the planting of a hedge on the site
Rye Logistics Park Rye Close Fleet Hampshire GU51 2UY
Approval of Conditions 4- external lighting scheme- 5- loading dock curtains- 6- landscaping- and 17- noise attenuation scheme- pursuant to 21/02894/AMCON Variation of Conditions 2, 3, 4, 5, 6, 11, 12 and 18 attached to Planning Permission 19/02871/FUL dated 18/12/2020.
Hawley Green Farm Hawley Road Blackwater Camberley GU17 9ED
Variation of Condition 7 (Landscaping) attached to Planning Permission 19/01374/FUL dated 11/10/2019
Elm Lodge Thackhams Lane Hartley Wintney Hook RG27 8JG
Approval of Condition 11- Landscape Management and Maintenance Plan pursuant to 19/01515/AMCON Variation of Condition 2 attached to Planning Permission 17/01816/FUL to allow an increase in floorspace, alterations to fenestration and the creation of a footpath to the car park (Additional details received 20.01.2020)
Land Between Moulsham Lane And Broome Close Yateley Hampshire
Variation of Condition 2 attached to Planning Permission 17/02793/REM dated 05/04/2018 to allow the relocation of the proposed SANG car park (Revised landscaping details received)
All Saints Church Church Road Fleet GU51 4NB
Approval of Condition 4- materials- pursuant to 21/01428/AMCON Variation of Condition 4 (materials) attached Planning Permission Application Reference Number: (19/00631/FUL) dated 29/10/2019 to enable works to progress in a phased manner. To change the text of the first line of the condition, so that the condition reads 'No above ground construction work for each area shall take place until details of each external surface relating to each area have been submitted to, and approved in writing by, the Local Planning Authority. This is to allow for phasing of the work, to enable progress with the first phase being the restoration of the church buildings and new porch, with associated landscaping.'