Grey House Mount Pleasant Hartley Wintney Hook Hampshire RG27 8PW
Apporval of Condition 7 - Ecological Mitigation and Enhancement Strategy- pursuant to 21/00630/FUL Demolition of existing buildings and erection of a 65 bed care home (Class C2 use), x4 two bed care dwellings (Class C3 use) and associated landscaping, parking, altered access and ancillary development
Grey House Mount Pleasant Hartley Wintney Hook Hampshire RG27 8PW
Approval of Condition 4 - CEMP- 5 - Landscape- 6 - Boundary Treatment - 8 - Arboricultural Method Statement - 10 - Waste Management -11 - Odour Management -12 - External Lighting - 13 - Noise - pursuant to 21/00630/FUL Demolition of existing buildings and erection of a 65 bed care home (Class C2 use), x4 two bed care dwellings (Class C3 use) and associated landscaping, parking, altered access and ancillary development
Grey House Mount Pleasant Hartley Wintney Hook Hampshire RG27 8PW
Approval of Condition 9- sustainability- pursuant to 21/00630/FUL Demolition of existing buildings and erection of a 65 bed care home (Class C2 use), x4 two bed care dwellings (Class C3 use) and associated landscaping, parking, altered access and ancillary development
Land On The North Side Of London Road Hook Hampshire
Approval of Conditions- 8- archaeology- 23- demolition/ construction management plan- 28- remediation/ contamination - and 30- drainage stategy- pursuant to 13/01145/MAJOR and 13/01145/NMMA Amendment to alter conditions to allow demolition to be viewed as commencement pursuant to 13/01145/MAJOR Erection of Class A1 retail development, associated servicing, car parking, landscaping, access arrangements and biomass boiler following demolition of existing buildings.
Guidion House Rye Close Fleet Hampshire GU51 2UY
Approval of Conditions 5- external lighting- 6- loading dock curtains- 7- soft landscaping- and 18- Noise Attenuation Scheme- pursuant to 19/02871/FUL Demolition of an existing office building and erection of new industrial units for flexible uses falling within Research and Development (Use Class E(g)(ii)), light industry (Use Class E(g)(iii)), general industry (Use Class B2) and storage and distribution (Use Class B8) with ancillary offices.
Guidion House Rye Close Fleet GU51 2UY
Approval of Condition 7- soft landscaping- pursuant to 19/02871/FUL Demolition of an existing office building and erection of new industrial units for flexible uses falling within Research and Development (Use Class E(g)(ii)), light industry (Use Class E(g)(iii)), general industry (Use Class B2) and storage and distribution (Use Class B8) with ancillary offices.
Land On The North Side Of London Road Hook Hampshire
Approval of Conditions 23- demolition/ construction management plan- 28- remediation/ contamination - and 38- full details of brick and slate farm outbuilding- pursuant to 13/01145/MAJOR and 13/01145/NMMA Amendment to alter conditions to allow demolition to be viewed as commencement pursuant to 13/01145/MAJOR Erection of Class A1 retail development, associated servicing, car parking, landscaping, access arrangements and biomass boiler following demolition of existing buildings.
Guidion House Rye Close Fleet GU51 2UY
Approval of Condition 3- Demolition and Construction Management Plan- and 4- Surface Water Drainage Scheme- pursuant to 19/02871/FUL Demolition of an existing office building and erection of new industrial units for flexible uses falling within Research and Development (Use Class E(g)(ii)), light industry (Use Class E(g)(iii)), general industry (Use Class B2) and storage and distribution (Use Class B8) with ancillary offices.
Queen Elizabeth Barracks Sandy Lane Church Crookham Fleet Hampshire GU13 0BF
Discharge of conditions, 23, 24 and 25 contamination pursuant to 11/00001/MAJOR Hybrid planning application with full details for phase 1 and details of means of access only for the remaining phases for the demolition and redevelopment of the site to provide: 872 residential units (316 in phase 1); 1.5ha site for a new primary school as part of phase 1; Local centre with 788.2m2 for floorspace for A1, A2, A3, A5 or D1 uses with a 112.8m2 energy centre all part of phase 1; 0.2ha site for a new community building as part of phase 2; Upto 7,500m2 of new employment floorspace for business purposes on 2ha land as part of phase 3; Retention of the existing 0.6ha employment use on Naishes Lane (known as the ASU site) as part of phase 1; Provision of 7.6ha of formal open space consisting of a multi use games area, a new running track with football pitch (within phase 2); 40 allotments with storage facility (within phase 1); Associated children's playspace facilities (across all phases); Private eight space car park off Sandy Lane (within phase 1); 40 space public car park to the south of the site off of Naishes Lane (within phase 1); Access improvements works (to include new footways and gates) to open space in the area to the south and east of Naishes Lane and the woodland areas adjoining the site at Naishes Lane and Sandy Lane (within phase 1); * Improvement works to the remaining areas of formal and informal open space within the development (across all phases). All with associated highway works, parking and landscaping.
Hartland Park Bramshot Lane Fleet Hampshire
Approval of details reserved by condition 14 -woodland management plan- 15- Arboricultural Implications Assessment- 16- Tree Protection Fencing- 17- Foul Drainage- 18- Details of Sustainable Urban Drainage System- 19- Surface Water Drainage Phase 2 Development- 20- Surface Water, Groundwater and Drainage- 22- Noise Mitigation Measures- 26- Management and Maintenance of Streets- 27- Street Sections- 28- Pedestrian and Cycleway provision- 29- Estate Street Phasing and Completion Plan- 32- Sustainable Building Performance- 34- Lighting Scheme- 38- Long Term Management of Foul and Surface Drainage- pursuant to (Phase 2) 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.