Hartland Park Ively Road Fleet Hampshire
Approval of Condition 31- materials- pursuant to 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.
Hartland Park Ively Road Fleet Hampshire
Approval of conditions 25- cycle parking and storage- and 31- materials- pursuant to 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.
Lamb Hotel High Street Hartley Wintney Hook Hampshire RG27 8NW
Approval of condition 3- external materials- pursuant to 20/01645/FUL Extension and alteration of building to facilitate the change of use of former hotel building to six dwellings (2x1 bedroom and 4x2 bedroom) with parking and the erection of retail unit
Lamb Hotel High Street Hartley Wintney Hook RG27 8NW
Approval of conditions 3- external material samples- 4- large scale window drawings-5- new floors- 6- new external joinery work- 7- method statement and specification- pursuant to 20/01646/LBC Extension and alteration of building to facilitate the change of use of former hotel building to six dwellings (2x1 bedroom and 4x2 bedroom) with parking and the erection of retail unit (Amended plans/updated information received)
Hartland Park Bramshot Lane Fleet Hampshire
Approval of details reserved by condition 14 -woodland management plan- 15- Arboricultural Implications Assessment- 16- Tree Protection Fencing- 17- Foul Drainage- 18- Details of Sustainable Urban Drainage System- 19- Surface Water Drainage Phase 2 Development- 20- Surface Water, Groundwater and Drainage- 22- Noise Mitigation Measures- 26- Management and Maintenance of Streets- 27- Street Sections- 28- Pedestrian and Cycleway provision- 29- Estate Street Phasing and Completion Plan- 32- Sustainable Building Performance- 34- Lighting Scheme- 38- Long Term Management of Foul and Surface Drainage- pursuant to (Phase 2) 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.
Hartland Park Bramshot Lane Fleet Hampshire
Approval of condition 11- masterplan open space strategy- pursuant to 17/00471/OUT Hybrid Planning Application (part full, part outline) for a residential-led mixed use redevelopment comprising: 1. Outline Planning Application with means of access (in part) to be determined (all other matters reserved for subsequent approval), for the erection of up to 1,500 dwellings (Use Class C3); a local centre including residential (Use Class C3 within the up to 1,500 dwellings) and up to 2,655m2 (GEA) of retail, commercial and/or community floorspace (Use Classes A1 to A5, B1, D1 and D2); a primary school (Use Class D1); drainage works including balancing ponds; on and off-site SANG mitigation; creation of landscaping, open space and ecological habitats; car and cycle parking; demolition of existing buildings; site clearance; earthworks; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works. 2. Full Planning Application for the erection of 181 dwellings (Use Class C3); access; drainage works including balancing ponds; creation of landscaping, open space and ecological habitats; car and cycle parking; earthworks; demolition of existing buildings; site remediation; provision of utilities infrastructure; off-site highway works; and all other ancillary and enabling works.